首页> 外文OA文献 >Evaluation of the GE N60 Relay
【2h】

Evaluation of the GE N60 Relay

机译:GE N60继电器评估

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

The GE N60 relay evaluation project was conducted by Brenna Andrews with help from Richard Setterstrom and Daniel Kachmarik from NorthWestern Energy. The goal of the project was to determine if the GE N60 relay was a sufficient replacement candidate for the Acceleration Trend Relays (ATRs) currently being utilized on four stem-coal generators in Colstrip, Montana, to protect the power system. The ATRs protect the power system from events such as faults or equipment damage. The criteria used to evaluate the GE N60 relay’s capabilities included the following: The GE N60 relay must have a sampling frequency equal to or greater than that of the ATRs. The GE N60 relay must have minimal noise so as not to affect trip decisions in the relay. The GE N60 relay must be able to accurately detect events. The GE N60 relay must be able to create and store event records of adequate length. The GE N60 relay was programmed to emulate the functions of the ATRs. Two Colstrip-Broadview transmission-line events were captured simultaneously by the ATRs and the GE N60 relay. Comparison of the speed deviation, acceleration, and power responses from these two events showed that the GE N60 relay is an adequate replacement candidate for the GE N60 relay. Refer to Figures 27 through 40.The GE N60 relay proved to have a variable sampling frequency. The relay determined events based on the frequency deviation and frequency rate of change threshold values. The frequency deviation value was sampled at 60Hz in the GE N60 relay, whereas the ATRs could sample at 150Hz. The decision was made that, until further testing could be completed, the lower frequency deviation sampling rate would not make the collected data unusable. From qualitative analysis, the noise level was proved to be acceptable, since the GE N60 relay trip decisions were not affected by what noise was present in the event responses. The decision was made that additional filtering could be implemented so long as the trip decision speed is not compromised. Finally, the GE N60 relay proved to accurately detect and store events. The GE N60 relay was able to detect events simultaneously with the ATRs, showing that the ATR functions were correctly emulated in the GE N60 relay. The GE N60 relay event records were of acceptable length and exceptional quality. Based on these results, the GE N60 relay was found to be an adequate replacement candidate for the ATRs in Colstrip and should move on to the next stages of testing.
机译:GE N60继电器评估项目由Brenna Andrews在西北能源公司的Richard Setterstrom和Daniel Kachmarik的帮助下进行。该项目的目标是确定GE N60继电器是否足以替代目前在蒙大拿州科尔斯trip的四台干煤发电机上使用的加速趋势继电器(ATR),以保护电力系统。 ATR保护电源系统免受故障或设备损坏等事件的影响。评估GE N60继电器性能的标准包括:GE N60继电器的采样频率必须等于或大于ATR的采样频率。 GE N60继电器必须具有最小的噪声,以免影响继电器的跳闸决定。 GE N60继电器必须能够准确检测事件。 GE N60继电器必须能够创建和存储足够长的事件记录。 GE N60继电器经过编程,可以模拟ATR的功能。 ATR和GE N60中继同时捕获了两个Colstrip-Broadview传输线事件。对这两个事件的速度偏差,加速度和功率响应的比较表明,GE N60继电器是GE N60继电器的合适替代者。请参阅图27至40。事实证明,GE N60继电器具有可变的采样频率。继电器根据频率偏差和频率变化率阈值确定事件。频率偏差值是在GE N60继电器中以60Hz采样的,而ATR可以以150Hz采样。做出的决定是,在无法完成进一步测试之前,较低的频率偏差采样率不会使所收集的数据不可用。通过定性分析,证明噪声水平是可以接受的,因为GE N60继电器跳闸决策不受事件响应中存在的噪声影响。做出的决定是,只要不影响行程决定速度,就可以实施附加过滤。最终,GE N60继电器被证明可以准确地检测和存储事件。 GE N60继电器能够与ATR同时检测事件,表明GE N60继电器正确模拟了ATR功能。 GE N60继电器事件记录的长度和质量都可以接受。根据这些结果,发现GE N60继电器是Colstrip中ATR的合适替代者,应继续进行下一阶段的测试。

著录项

  • 作者

    Andrews Breanna;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号