首页> 外文OA文献 >Perencanaan Transportasi Persampahan di Kota Rantepao Kabupaten Toraja Utara
【2h】

Perencanaan Transportasi Persampahan di Kota Rantepao Kabupaten Toraja Utara

机译:北托拉贾摄政区兰特包市的固体废物运输规划

摘要

PERENCANAAN TRANSPORTASI PERSAMPAHAN DI KOTA RANTEPAO KABUPATEN TORAJA UTARAududISHAK K. SALEMPANGudMahasiswa S1udJurusan Teknik SipiludProdi Teknik LingkunganudFakultas Teknik Univ. HasanuddinudJl. P. kemerdekaan Km. 10, TamalanreaudMakassar, 90245 Ph/Fax: 0411-587636udE-mail: ishaksalempang@gmail.comudud udSuharman Hamzah, ST. MT. PhD. Eng. HSE CertudDosen Jurusan Teknik SipiludFakultas Teknik Univ. HasanuddinudJl. P. Kemerdekaan Km. 10, TamalanreaudMakassar, 90245 Ph/Fax: 0411-587636/580505udududM.Asad Nur Abdurahman, ST. M.Eng. P.MudDosen Jurusan Teknik SipiludFakultas Teknik Univ. HasanuddinudJl. P. Kemerdekaan Km. 10, TamalanreaudMakassar, 90245 Ph/Fax: 0411-587636/580505ududud udAbstrakududTransportasi sampah adalah sub-sistem persampahan yang bersasaran membawa sampah dari lokasi pemindahan atau dari sumber sampah secara langsung menuju Tempat Pembuangan Akhir (TPA). Pada Kota Rantepao, tidak ada perencanaan transportasi persampahan menyebabkan ketidakteraturan jadwal pengangkutan serta jalur pengangkutan sampah. Hal inilah yang menjadi alasan penelitian ini dilaksanakan di Kota Rantepao sebagai sampel perencanaan. Tujuan dari penelitian ini adalah untuk merencanakan sistem pengangkutan dan pola pengumpulan sampah, menganalisis jumlah ritasi per hari, dan menganalisis timbulan sampah masyarakat Kota Rantepao. Dalam perencanaan ini, metode pengangkutan sampah dari TPS ke TPA yang digunakan adalah Hauled Container System (HCS) cara 1 dan metode pengumpulan sampah Individual Tidak Langsung. Dari hasil penelitian ini, waktu rata-rata yang dibutuhkan kendaraan pengangkut sampah untuk mengumpulkan sampah dari sumber sampah adalah 3,28 jam per ritasi dan waktu rata-rata yang dibutuhkan kendaraan pengangkut sampah untuk mengangkut sampah dari TPS ke TPA adalah 1,05 jam/ritasi. Untuk mengoptimalkan system transportasi persampahan di Kota Rantepao per 1 kali putaran, proses pengumpulan sampah dari sumber sammpah ke TPS dilakukan pada hari Senin ??? Sabtu dan untuk waktu pengangkutan sampah dari TPS ke TPA dilakukan pada hari Senin, Selasa, Kamis dan Sabtu. Waktu kerja pengumpulan adalah 3 jam dimulai pada pukul 05.00 dan untuk waktu kerja pengangkutan adalah 4 jam dimulai setelah semua sampah sudah terkumpul di TPS. Setiap kendaraan melakukan 1 ritasi per hari sesuai dengan waktu kerja yang telah ditentukan. Dengan sistem transportasi ini, diharapkan jumlah sampah yang terangkut lebih 90% dari total timbulan sampah Kota Rantepao.ududKata Kunci: transportasi, sampah, pengangkutan, pengumpulan, ritasiudAbstractududTransportation of garbage is a sub-system of targeted waste carrying garbage from the relocation site or from waste sources directly to the Final Disposal (TPA). On Rantepao City, there is no cause irregularity of solid waste transportation planning schedule and track the transport of waste transport. This is the reason for the research was conducted in the city of Rantepao in the sample plan. The purpose of this study was to plan for the transport system and the pattern of waste collection, analyzing the number of ritasi per day, and analyze the waste generation Rantepao City community. In this plan, the method of transporting waste from TPS to TPA used was hauled Container System (HCS) means 1 and garbage collection Individual Indirect. From the results of this study, the average time it takes a vehicle transporting garbage to collect garbage from waste sources was 3.28 hours per ritasi and the average time it takes a vehicle to transport garbage garbage from TPS to TPA is 1.05 hours / ritasi. To optimize the transport system of solid waste in the city of Rantepao per first time round, the garbage collection process from waste sources to the polls conducted on Monday - Saturday and for waste transportation time from TPS to TPA conducted on Monday, Tuesday, Thursday and Saturday. The working time is 3 hours gathering starts at 05.00 and for the transport working time is 4 hours started after all the trash is collected at polling stations. Every vehicle has one ritasi per day in accordance with a predetermined working time. With this transport system, the expected volume of waste transported over 90% of the total waste generation Rantepao City.ududKeywords: transportation, trash, transport, gathering, rotation
机译:UUD环境工程学系土木工程学士,S1,土库沙克K. SALEMPANG,北托拉亚地区兰泰波市的固体运输规划哈桑丁体育独立。 10,Tamalanrea 望加锡,90245电话/传真:0411-587636 电子邮件:ishaksalempang@gmail.com ud ud udSuharman Hamzah,ST。公吨。博士。大学工程学院土木工程系HSE证书讲师。哈桑丁体育独立。地址:10,Tamalanreaud Makassar,90245 Ph /传真:0411-587636 / 580505udud.Aad Sad Nur Abdurahman,ST。英P.Mud,大学工程学院土木工程系讲师哈桑丁体育独立。 10,孟加锡,塔马兰兰,90245电话/传真:0411-587636 / 580505直接运往垃圾填埋场结束(TPA)。兰特包市没有废物运输计划,这会导致运输时间表和垃圾运输路线不规则。这就是为什么在兰特包市进行这项研究作为计划样本的原因。这项研究的目的是规划运输系统和废物收集的方式,分析每天的仪式数量,并分析Rantepao市社区的垃圾产生情况。在此计划中,将废物从TPS运送到所使用的TPA的方法是拖运式集装箱系统(HCS)方法1和间接个人废物收集方法。根据这项研究的结果,垃圾运输车从废物源收集废物的平均时间为每次访问3.28小时,垃圾运输车将废物从TPS运送到TPA的平均时间为1.05小时/利塔西。为了使Rantepao市的废物运输系统每轮优化一次,从废物源收集废物到投票站的过程在星期一完成。星期六以及将废物从TPS运送到TPA的过程在星期一,星期二,星期四和星期六进行。从TPS开始收集所有垃圾后,收集工作时间从05.00开始为3小时,运输工作时间为4小时。每辆车根据预定的工作时间每天出行1次。有了这种运输系统,预计兰特包市的垃圾运输量将占废物产生总量的90%以上关键词:运输,垃圾,运输,收集,收集,定量,运输,运输从搬迁地点或从废物源直接运送到最终处置场(TPA)的废物。在兰特包市,没有任何固体废物运输规划计划的违规行为,并且不会跟踪废物运输的运输。这就是在样本计划中在Rantepao市进行研究的原因。这项研究的目的是规划运输系统和废物收集的模式,分析每天的口粮数量,并分析兰特包市社区的废物产生。在此计划中,将废物从TPS运送到TPA的方法是拖运式集装箱系统(HCS)手段1和个人间接垃圾收集。从这项研究的结果来看,运输车辆从废物源收集垃圾的平均时间为每趟3.28小时,而从TPS到TPA的运输垃圾的平均时间为1.05小时/ ritasi。为了使Rantepao市的固体废物运输系统第一次达到最佳状态,周一至周六进行了从废物源到民意测验的垃圾收集过程,周一,周二,周四和周三进行了从TPS到TPA的废物运输时间。星期六工作时间是3个小时,从05.00开始收集,对于运输工作时间是在将所有垃圾收集到投票站之后开始4个小时。根据预定的工作时间,每辆车每天旋转一圈。通过这种运输系统,预期的废物运输量将超过兰特包市总废物产生量的90%。 Ud ud关键字:运输,垃圾,运输,收集,轮换

著录项

  • 作者

    Salempang Ishak Kwarto;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种 other
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号