首页> 外文OA文献 >Modelling Of Water Resources in Bakaru Hydropower Plant in Anticipating Load Increment in Sulselbar Power System
【2h】

Modelling Of Water Resources in Bakaru Hydropower Plant in Anticipating Load Increment in Sulselbar Power System

机译:预计苏尔巴电力系统负荷增加的巴卡鲁水电站水资源建模

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Bakaru hydro power plan water resources model will describe a model in anticipating load growth in Sulselbar Power System until year 2030. Bakaru hydro power plan is supplied by Mamasa, Sumarorong, and Lembang watershed, water supply is influenced with rain fall volume, topography condition (steep slope, type of soil, and land use) of a water catchment area. A model is constructed using Fuzzy logic in water water inflow is Y = 0,0687X2 ??? 4,279X + 82,917 and erosion inflow is Y = - 0.0001X2 + 0.0106X + 0.117, the model shows that increament in operation time at catchment area where there are changes in land uses will affected lower water inflow and bigger erosion inflow.
机译:Bakaru水电计划水资源模型将描述一个预计到2030年苏尔巴巴电力系统负荷增长的模型。Bakaru水电计划由Mamasa,Sumarorong和Lembang流域提供,供水量受降雨量,地形条件的影响(集水区的陡坡,土壤类型和土地利用)。使用模糊逻辑构造的水入水量为Y = 0,0687X2的模型? 4,279X + 82,917,侵蚀流入为Y =-0.0001X2 + 0.0106X + 0.117,该模型显示,在土地用途发生变化的集水区,作业时间的减弱将影响较低的水流入和较大的侵蚀流入。

著录项

  • 作者

    Said Sri Mawar;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号