首页> 外文OA文献 >Evaluating Dam Safety Retrofits With Uncertain Benefits: The Case of Mohawk Dam (Walhonding River, Ohio)
【2h】

Evaluating Dam Safety Retrofits With Uncertain Benefits: The Case of Mohawk Dam (Walhonding River, Ohio)

机译:以不确定的利益评估大坝的安全改造:以莫霍克大坝为例(俄亥俄州沃伦丁河)

摘要

Mohawk Dam, part of the Muskingum basin flood control system, was built in 1938 and is operated by the U.S. Army Corps of Engineers (Corps). Since this high-hazard dam could not survive a probable maximum flood (PMF), the Corps conducted a study to determine the least expensive means of enabling the dam to survive a PMF. Applying a previously proposed framework to select the social cost minimizing capacity of a dam, we show that Mohawk Dam had sufficient capacity that any retrofit has a social cost larger than expected benefits. Sensitivity analyses were performed adjusting the peak flow distribution, the costs of modification, and downstream flood damage, as well as the possibility of loss of life. For any reasonable value of these variables the conclusion does not change that the structure already met so high a safety goal regarding extreme floods that no retrofit is needed. Using risk-based methods to perform reservoir safety evaluations, as recommended by a National Research Council committee in 1985, is indeed feasible. Furthermore, their use provides valuable insight and guidance into the selection of strategies to enhance the safety of dams.
机译:莫霍克水坝(Mohawk Dam)是Muskingum流域防洪系统的一部分,建于1938年,由美国陆军工程兵团(Corps)运营。由于该高危水坝无法承受可能的最大洪水(PMF),因此军团进行了一项研究,以确定使水坝能够承受PMF的最廉价方法。应用先前提出的框架来选择使大坝的社会成本最小化的能力,我们表明莫霍克水坝具有足够的能力,任何翻新工程所产生的社会成本都大于预期收益。进行了敏感性分析,以调节峰值流量分布,改造成本和下游洪灾损害以及生命损失的可能性。对于这些变量的任何合理值,结论不会改变,即该结构已经满足了极端洪水的安全目标,因此无需进行改造。实际上,按照美国国家研究委员会(National Research Council)委员会在1985年的建议,使用基于风险的方法进行储层安全性评估确实是可行的。此外,它们的使用为选择大坝安全策略提供了宝贵的见识和指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号