Cost and Scope Breakdown Structure for Functional Level Estimating of Consultant Fees

机译:顾问费功能级别估算的成本和范围细分结构

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Estimating the cost of preconstruction services (PCSs) during the early phases of highway project development is an important task requiring an increased level of attention. Research has found a link between early investment in PC planning and design services and final project costs. The purpose of this paper is to assess current estimating practices and propose a cost and scope breakdown structure (CSBS) framework to structure functional level estimation of consultant fees. Such a framework is promoted to reduce the chance that underfunded PCSs may degrade postaward construction contract cost certainty. This study found that PCSs were generally viewed as a minor component of a project’s budget and were sometimes estimated without subsequent preconstruction cost control or accountability. Current practices for consultant fee estimating by state departments of transportation (DOTs) documented in this study show little standardization in estimating practices across and within transportation agencies. As a consequence, many individuals are creating their own tools to develop PCS cost estimates. The result is that national and regional consultants that work in more than a single state are forced to expend additional effort to maintain agency-specific work task databases; the cost no doubt is passed back to the agency in increased overhead costs. This study found that application of a CSBS to classify specific work tasks and utilization of a database of previous project cost information promote consistency and aid contract negotiations with consultants.
机译:在公路项目开发的早期阶段,估计施工前服务(PCS)的成本是一项重要任务,需要引起更多关注。研究发现,对PC计划和设计服务的早期投资与最终项目成本之间存在联系。本文的目的是评估当前的估算方法,并提出成本和范围分解结构(CSBS)框架,以构建顾问费用的功能水平估算。提倡使用这样的框架,以减少资金不足的PCS可能降低授予后施工合同的成本确定性的机会。这项研究发现,PCS通常被认为是项目预算的一小部分,有时是在没有后续施工前成本控制或问责制的情况下进行估算的。这项研究中记录的国家运输部(DOT)当前的顾问费估算实践表明,在运输机构内部和内部估算实践的标准化很少。结果,许多人正在创建自己的工具来开发PCS成本估算。结果是,在多个州工作的国家和地区顾问被迫花费更多的精力来维护特定于机构的工作任务数据库;毫无疑问,成本会以增加的间接费用成本转嫁给代理商。这项研究发现,将CSBS应用于特定工作任务的分类以及利用先前项目成本信息的数据库可以促进一致性,并帮助与顾问进行合同谈判。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号