首页> 外文OA文献 >Pengelolaan Supply Produk Waferstick dengan Mempertimbangkan Kapasitas Produksi dan Persediann Barang Jadi di PT. Tiga Pilar Sejahtera Food, Tbk
【2h】

Pengelolaan Supply Produk Waferstick dengan Mempertimbangkan Kapasitas Produksi dan Persediann Barang Jadi di PT. Tiga Pilar Sejahtera Food, Tbk

机译:通过考虑PT的产能和成品供应来进行Waferstick产品供应管理。 Tiga Pilar Sejahtera食品,Tbk

摘要

In general, planning supply use the information from combining varying capacity and inventory to plant the aggregate rates of production by time period for groups of product. This research objective is PT. Tiga Pilar Sejahtera's (TPS) that produces wafersticks. In the company sometimes occured the waferstick product can be not fulfilled. This is happened because waferstick inventory unstable. This causes problem that PT. Tiga Pilar Sejahtera (TPS) was less capable to fullfil the market's demands. to solve this PT. TPS should be managing the working hours, workforces, production capacity and finished good inventory, they are called aggregate planning. This research are determine safety stocks, planning supply and material inventory planning. Managing supply of waferstick product is started by forecast the demand. The forecast result is used to estimate safety stock of waferstick. Then the forecasting result and safety stock became of input Integer linier programming model to determine aggregate planning. The aggregare planning is used to find optimal lot size of waferstick raw material. Then lot sizing become input Planned Order Receipt in the Material Planning Requirement (MPR). Forecast method used to forecast the demand is decomposition, this method is the best method to find estimation demand because it have more less MAD than the other. The determination of the safety stock is actually more accurate with the 90% by Romy & Yuli waferstick safety inventory is 1106 cartons and 2364 cartons for Pio. From aggregate planning there is back order in 13th is 11 cartons. The planning cost for Romy & Yuli waferstick Rp 625.670.902,33 and cost for Pio waferstick Rp 1.462.296.180,00. Waferstick material planning by optimal lot size between 695 kilograms up to 8487 kilograms by waferstick material cost is Rp. 6.315.520,00.
机译:通常,计划供应使用组合不同容量和库存的信息来按产品组按时间段累计总生产率。该研究目标是PT。 Tiga Pilar Sejahtera(TPS)生产威化饼。在公司中有时会发生威化棒产品无法实现的情况。发生这种情况是因为威化饼库存不稳定。这引起了PT的问题。 Tiga Pilar Sejahtera(TPS)不能满足市场需求。解决这个PT。 TPS应该管理工作时间,劳动力,生产能力和成品库存,这被称为总体计划。这项研究是确定安全库存,计划供应和物料库存计划。通过预测需求开始管理晶片产品的供应。预测结果用于估计威化饼的安全库存。然后,输入的Integer linier规划模型的预测结果和安全库存就决定了总体规划。总体规划用于查找威化饼原料的最佳批量。然后,批量确定成为物料计划需求(MPR)中的输入计划订单收货。用于预测需求的预测方法是分解方法,因为它比其他方法具有更少的MAD,因此它是找到估计需求的最佳方法。安全库存的确定实际上更加准确,Romy&Yuli硅片的90%安全库存是1106箱和2364箱Pio。从总体规划来看,第13箱的未交货订单为11箱。 Romy和Yuli威化饼的计划成本Rp 625.670.902,33和Pio威化饼的计划成本Rp 1.462.296.180,00。晶圆棒材料计划的最佳批量为695公斤至8487公斤(晶圆棒材料成本为Rp)。 6.315.520,00。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号