首页> 外文OA文献 >Progress in Transferable Work-load Projects : Development of a Robust Method for the Evaluation and Forecasting of Distributed Progress
【2h】

Progress in Transferable Work-load Projects : Development of a Robust Method for the Evaluation and Forecasting of Distributed Progress

机译:可转移工作量项目的进度:开发一种可靠的方法来评估和预测分配的进度

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In large projects measuring progress is always difficult due to the complexities involved, because the realization is shared among departments of a firm or even between firms disseminated all over the world. Project management and operations research literature is reviewed for discovering various techniques applicable. Widely used tools for progress measurement and forecasting, such as Earned Value Analysis, Progress Plot, Milestone and Resource slip charts, concurrent engineering, can be employed. This thesis is based on a problem of pharmaceutical industry where the effectiveness of a certain medical treatment is examined on patients in a number of countries. The number of variables involved increase the complexity of this problem. The main objective is to analyze the effectiveness of a solution in different situations during the project such that a better project duration and a lower cost can be achieved. Our findings suggest that reallocation of patients among countries produces better results in terms of progress.
机译:在大型项目中,由于涉及的复杂性,始终很难衡量进度,因为实现是在公司部门之间乃至在全球分布的公司之间共享的。审查了项目管理和运营研究文献,以发现各种适用的技术。可以使用广泛用于进度测量和预测的工具,例如挣值分析,进度图,里程碑和资源滑图,并发工程。本论文基于制药业的问题,在该问题中,对许多国家/地区的患者进行了某种药物治疗的有效性检查。涉及的变量数量增加了此问题的复杂性。主要目标是分析项目期间不同情况下解决方案的有效性,以便获得更好的项目工期和更低的成本。我们的研究结果表明,就进展情况而言,在国家之间重新分配患者会产生更好的结果。

著录项

  • 作者

    Khalid Rameez;

  • 作者单位
  • 年度 2009
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号