首页> 外文OA文献 >Optimal predictive control of water transport systems: Arrêt-Darré/Arros case study
【2h】

Optimal predictive control of water transport systems: Arrêt-Darré/Arros case study

机译:输水系统的最佳预测控制:Arrêt-Darré/ Arros案例研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper proposes the use of predictive optimal control as a suitable methodology to manage efficiently transport water networks. The predictive optimal controller is implemented using MPC control techniques. The Arrêt-Darré/Arros dam-river system located in the Southwest region of France is proposed as case study. A high-fidelity dynamic simulator based on the full Saint-Venant equations and able to reproduce this system is developed in MATLAB/SIMULINK to validate the performance of the developed predictive optimal control system. The control objective in the Arrêt-Darré/Arros dam-river system is to guarantee an ecological flow rate at a control point downstream of the Arrêt-Darré dam by controlling the outflow of this dam in spite of the unmeasured disturbances introduced by rainfalls incomings and farmer withdrawals.
机译:本文提出了使用预测性最优控制作为有效管理输水网络的合适方法。预测最优控制器是使用MPC控制技术实现的。作为案例研究,提出了位于法国西南地区的Arrêt-Darré/ Arros坝-河系统。在MATLAB / SIMULINK中开发了基于完整Saint-Venant方程并能够重现该系统的高保真动态仿真器,以验证所开发的预测最优控制系统的性能。 Arrêt-Darré/ Arros大坝-河道系统的控制目标是,尽管降雨和雨水造成了不可估量的干扰,但仍通过控制大坝的出水来确保Arrêt-Darré大坝下游控制点的生态流量。农民取款。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号