首页> 外文OA文献 >Developing a scope Risk Evaluation Framework for Olympic Games’ Legacy Projects and Implementing the Framework as a case study survey for Convergence Theme in Regeneration of London Host Boroughs
【2h】

Developing a scope Risk Evaluation Framework for Olympic Games’ Legacy Projects and Implementing the Framework as a case study survey for Convergence Theme in Regeneration of London Host Boroughs

机译:为奥运会的遗留项目开发范围风险评估框架,并将该框架作为伦敦东区自治市复兴的融合主题案例研究进行实施

摘要

2013 dissertation for MSc in Project Management. Selected by academic staff as a good example of a masters level dissertation. ududDiscovering and generating something new is an exciting experience although heuristic research is often a difficult task as you may not always find others’ footprints to step on. It was exactly what happened in this research as effort was made to answer a real life business need i.e. the need for a suitable framework for evaluating scope risks in Olympic Legacy projects. udThe present dissertation had two components the first a heuristic one to develop a scope risk evaluation framework, and the second a case study survey to apply the model to a high value purpose area of the legacy i.e. convergence of the host boroughs to the neighboring areas and the rest of the city of London.udThe main questions to address in this research were if there could be identified any logical goal-oriented model of risk-based thinking with the help of which a legitimate framework can be developed to understand what are the main probable risk factors for legacy functions (in this case convergence theme) and what would be the impact levels and priority of such risks. udIn this research, after developing the framework, a questionnaire battery was developed with customized phrasing of known scope risk factors so as to reflect negative forces which may impact convergence desired outcomes. The online administration of the survey revealed that 10 out of 11 risk categories were evaluated by a group of 34 selected respondents as probable and having significant impact on the convergence aims. It was also revealed that 17 of the 30 risk factors under these categories were evaluated as likely and very likely to happen. And 20 of these 30 risk factors have significant impact on convergence aims in case that they happen. Prioritization of the results also showed that exaggerated future functionality, overestimated funding, unmanaged downsizing, intangible deliverable problems are the most important priority risk factors threatening the convergence aims.
机译:2013年,获得项目管理理学硕士学位。被学术人员选为硕士论文的典范。 ud ud发现和生成新事物是令人兴奋的体验,尽管启发式研究通常是一项艰巨的任务,因为您可能并不总是会发现别人的脚印。正是为了响应现实生活中的业务需求(即需要一个合适的框架来评估Olympic Legacy项目中的范围风险),这项研究才发生了这一情况。 ud本论文有两个组成部分,第一个是启发式的,用于开发范围风险评估框架,第二个是案例研究,将模型应用于遗产的高价值目标区域,即东道主行政区与邻近区域的融合 ud本研究中要解决的主要问题是,是否可以确定任何基于风险的,基于逻辑的,以目标为导向的,基于风险的思维模型,并以此为基础,可以开发出一个合法的框架来理解什么是什么?遗留功能的主要可能风险因素(在本示例中为融合主题)以及此类风险的影响程度和优先级是什么。 ud在这项研究中,在开发了框架之后,使用已知范围风险因素的定制措辞开发了一个问卷调查表,以反映可能影响收敛预期结果的负面影响。该调查的在线管理表明,由34个选定的受访者组成的小组评估了11种风险类别中的10种可能性,并且对趋同目标产生了重大影响。还发现,在这些类别的30个风险因素中,有17个被评估为很可能发生。在这30个风险因素中,有20个会对收敛目标产生重大影响。对结果进行优先排序还表明,夸大的未来功能,高估的资金,无法管理的缩小规模,无形的可交付问题是威胁到融合目标的最重要的优先级风险因素。

著录项

  • 作者

    Reihanisardhai Mahsa;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号