首页> 外文OA文献 >Rural electrification in India: Galilee Basin coal versus decentralised renewable energy micro grids
【2h】

Rural electrification in India: Galilee Basin coal versus decentralised renewable energy micro grids

机译:印度的农村电气化:加利利盆地的煤​​炭与分散式可再生能源微电网

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The state of Bihar in India has approximately 75 million people with no access to electricity. The government of India has pursued a policy of rural electrification through the provision of centralised coal-fired power which has been unable to resolve the low levels of electrification. Coal supply woes in India have led Indian companies to pursue new coal mines in Australia’s Galilee Basin. The costs of these mining ventures will be high due to the mining infrastructure required and long transport distances to rural India. A high level analysis of mining, transport and power station investment to meet rural demand in Bihar shows that the absolute investment requirement using coal, especially coal sourced from Australia, as an expensive option. Pursuing electrification through village level, renewable energy micro-systems requires lower financing and provides more flexibility. Pollution costs associated with coal-fired generation, employment benefits associated with many village implementations and a rural load unsupported by industry load, show the benefit associated with decentralised, renewable energy electrification.
机译:印度比哈尔邦大约有7500万人无法用电。印度政府通过提供集中式燃煤电力奉行了农村电气化政策,这无法解决电气化水平低下的问题。印度的煤炭供应困境导致印度公司在澳大利亚的加利利盆地寻找新的煤矿。由于所需的采矿基础设施以及到印度农村的长途运输,这些采矿企业的成本将很高。为满足比哈尔邦农村需求而对采矿,运输和电站投资进行的高层次分析表明,使用煤炭(尤其是从澳大利亚采购的煤炭)的绝对投资需求是一种昂贵的选择。通过村级电气化,可再生能源微系统需要较少的资金并提供更大的灵活性。与燃煤发电相关的污染成本,与许多村庄实施相关的就业收益以及没有工业负荷支持的农村负荷,都显示了分散式可再生能源电气化带来的收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号