首页> 外文OA文献 >Hydraulic Design of Stepped Spillways and Downstream Energy Dissipators for Embankment Dams
【2h】

Hydraulic Design of Stepped Spillways and Downstream Energy Dissipators for Embankment Dams

机译:堤坝阶梯溢洪道和下游消能工的水力设计。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In recent years, the design flows of many dams were re-evaluated, often resulting in discharges larger than the original design. In many cases, the occurrence of the revised flows could result in dam overtopping because of insufficient storage and spillway capacity. An experimental study was conducted herein to gain a better understanding of the flow properties in stepped chutes with slopes typical of embankment dams. The work was based upon a Froude similitude in large-size experimental facilities. A total of 10 configurations were tested including smooth steps, steps equipped with devices to enhance energy dissipation and rough steps. The present results yield a new design procedure. The design method includes some key issues not foreseen in prior studies : e.g., gradually varied flow, type of flow regime, flow resistance. It is believed that the outcomes are valid for a wide range of chute geometry and flow conditions typical of embankment chutes.
机译:近年来,对许多大坝的设计流量进行了重新评估,通常导致流量比原始设计大。在许多情况下,由于存储和溢洪道容量不足,修订后的流量的发生可能会导致大坝超车。本文进行了一项实验研究,以更好地理解带有斜坡的堤坝阶梯状滑槽的流动特性。这项工作是基于大型实验设施中的Froude相似性。总共测试了10种配置,包括平滑台阶,配备有增强能量耗散装置的台阶和粗糙台阶。目前的结果产生了新的设计程序。设计方法包括一些先前研究中未预见的关键问题:例如,逐渐变化的流量,流态类型,流阻。可以相信,这种结果对于路堤斜槽典型的各种斜槽几何形状和流动条件都是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号