Hawaii Deep Water Electrical Transmission Cable Demonstration Program : Phase I Task 1 general management reports

机译:夏威夷深水输电电缆示范计划:第一阶段任务1一般管理报告

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Phase I: Task 1, General management reports. This Program Management Plan (PMP) has been prepared to identify and specify the administrative, technical and fiscal functions and controls that will be utilized during the Hawaii Deep Water Electrical Transmission Cable Demonstration Program (HDWC Program). The functions and controls have been developed and designed to assure that the overall Program work tasks are performed to the highest quality possible within the Program's organizational, time and budgetary constraints. Although this PMP has been prepared during the preliminary definitional phase of work (Phase I), it is intended for use by the Program Team as a working plan and directive during succeeding phases of work. As such, this PMP will be a dynamic document that will reflect changing Program conditions through revisions in design approach, scope and detail of Program elements as the project progresses.
机译:第一阶段:任务1,常规管理报告。准备该计划管理计划(PMP)是为了确定和指定将在夏威夷深水输电电缆示范计划(HDWC计划)中使用的行政,技术和财政职能和控制。已经开发和设计了功能和控制措施,以确保在计划的组织,时间和预算限制内,以最高质量执行计划的整体工作任务。尽管此PMP是在工作的初步定义阶段(第一阶段)编写的,但仍打算由计划团队用作后续工作阶段的工作计划和指令。因此,该PMP将是一个动态文档,它将随着项目的进行而对设计方法,范围和详细内容进行修订,以反映不断变化的计划条件。

著录项

  • 作者

    Chapman G.A.;

  • 作者单位
  • 年度 1982
  • 总页数
  • 原文格式 PDF
  • 正文语种 en-US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号