The purpose of this preliminary feasibility study of an undersea cable linking Molokai and Maui is to explore in greater detail the feasibility of such a cable. CH2M HILL's previous study, "A Prelimiary Overview of Power Supply Alternatives for Molokai," concluded that an undersea cable could provide the lowest cost power to Molokai, assuming the cost of the cable was supported by electric ratepayers on both Molokai and Maui. This study further address the technical feasibility of a cable, the availability of a power supply from Maui, the possible methods of financing the cable, and the economics of the cable.
展开▼