首页> 外文OA文献 >A New lower bound for the resource-constrained project scheduling problem with generalized precedence relations
【2h】

A New lower bound for the resource-constrained project scheduling problem with generalized precedence relations

机译:具有广义优先关系的资源受限项目调度问题的新下界

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In this paper we propose a new lower bound for the resource-constrained project scheduling problem with generalized precedence relationships. The lower bound is based on a relaxation of the resource constraints among independent activities and on a solution of the relaxed problem suitably represented by means of an AON acyclic network. Computational results are presented and confirmed a better practical performance of the proposed method with respect to those present in the literature.
机译:在本文中,我们提出了具有广义优先级关系的资源受限项目调度问题的新下界。下限基于独立活动之间资源约束的放松,以及基于通过AON非循环网络适当表示的放松问题的解决方案。计算结果被提出并证实了所提出的方法相对于文献中存在的更好的实际性能。

著录项

  • 作者

    Bianco, L; Caramia, M;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号