首页> 外文OA文献 >Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts
【2h】

Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts

机译:英国建筑行业的绩效评估及其在支持精益建筑概念应用中的作用

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Performance measurement has received substantial attention from researchers and the construction industry over the past two decades. This study sought to assess UK practitioners' awareness of the importance of the use of appropriate performance measures and its role in supporting the application of Lean Construction (LC) concepts. To enable the study to achieve its objectives, a review of a range of measurements developed to evaluate project performance including those devoted to support LC efforts was conducted. subsequently a questionnaire survey was developed and sent to 198 professionals in the UK construction industry as well as a small sample of academics with an interest in LC. Results indicated that although practitioners recognise the importance of the selection of non-financial performance measures, it has not been properly and widely implemented. The study identified the most common techniques used by UK construction organisations for performance measurement, and ranked a number of non-financial key performance indicators as significant. Some professed to have embraced the Last Planner System methodology as a means for performance measurement and organisational learning, while further questioning suggested otherwise. It was also suggested that substance thinking amongst professionals could be a significant hidden barrier that militates against the successful implementation of LC
机译:在过去的二十年中,性能测量一直受到研究人员和建筑行业的广泛关注。这项研究旨在评估英国从业者对使用适当绩效指标的重要性及其在支持精益建设(LC)概念应用中的作用的认识。为了使研究能够实现其目标,对评估项目绩效的一系列衡量指标进行了审查,包括专门用于支持LC工作的衡量指标。随后,开发了问卷调查表,并将其发送给英国建筑业的198名专业人员以及对LC感兴趣的一小部分学者。结果表明,尽管从业人员认识到选择非财务绩效指标的重要性,但尚未得到适当和广泛的实施。该研究确定了英国建筑组织用于绩效评估的最常用技术,并对许多非财务关键绩效指标进行了排名。有些人声称接受了Last Planner System方法作为绩效衡量和组织学习的一种手段,而进一步的质疑则相反。也有人建议,专业人员之间的实质思维可能是阻碍成功实施LC的重大隐性障碍

著录项

  • 作者

    Sarhan Saad; Fox Andrew;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号