Tracking and controlling of engineering deliverables for EPC projects

机译:跟踪和控制EPC项目的工程交付物

摘要

In EPC (Engineering, Procurement and Construction) projects, the engineering/design phase is crucial as it has a direct impact on the delivery of such complex projects. Efficient tracking of engineering deliverables is a key to the successful delivery of these projects. Many studies have been carried out in this domain to develop tracking and control systems, particularly for A/E firms. The engineering deliverables in the Engineering/Design phase in EPC projects should be controlled individually and should be integrated with the project schedule. The aim of this research is to study current practice in the management area referred above and present a methodology that enhances tracking and controlling of engineering deliverables; integrating the cost and schedule functions; forecasting the cost and time at the report date and at completion; and for integrating the engineering deliverables with the project schedule to demonstrate their effects on the delivery of such projects. To demonstrate the use and essential features of the proposed methodology, a computerized system has been developed in the Microsoft ® Windows XP environment using Excel sheet 2003. The developed system operates at three levels in EPC projects: (1) the deliverables level; (2) the activities level; and at (3) the project level. It is a stand alone system that can be used as an independent add-on utility to the project management software of the industrial partner "PM+". The developed system can be used to assist the project management teams on making decisions to improve the delivery of the EPC projects considering the impact of engineering deliverables. A training set of data developed by an industrial partner, SNC-LAVALIN, from of their EPCM projects, is utilized to validate the accuracy and functionality of the developed system
机译:在EPC(工程,采购和建筑)项目中,工程/设计阶段至关重要,因为它直接影响到此类复杂项目的交付。有效跟踪工程交付成果是成功交付这些项目的关键。在这一领域已经进行了许多研究,以开发跟踪和控制系统,特别是针对A / E公司。 EPC项目的“工程/设计”阶段中的工程可交付成果应单独控制,并应与项目进度表集成。这项研究的目的是研究上述管理领域的当前实践,并提出一种可增强对工程交付物的跟踪和控制的方法。整合成本和进度功能;在报告日期和完成时预测成本和时间;并将工程交付成果与项目进度表整合在一起,以证明其对此类项目交付的影响。为了演示所提出方法的用途和基本特征,已在Microsoft®Windows XP环境中使用Excel sheet 2003开发了一个计算机化系统。开发的系统在EPC项目中的运行分为三个级别:(1)可交付成果级别; (2)活动水平;在(3)项目级别。它是一个独立的系统,可以用作工业伙伴“ PM +”的项目管理软件的独立附加实用程序。考虑到工程可交付成果的影响,开发的系统可用于协助项目管理团队做出决策,以改善EPC项目的交付。由工业合作伙伴SNC-LAVALIN从其EPCM项目中开发的培训数据集可用于验证所开发系统的准确性和功能性

著录项

  • 作者

    Haggag Tarek;

  • 作者单位
  • 年度 2006
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号