Labor requirements for handling manure from concrete basins

机译:处理混凝土盆粪的劳动要求

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Time requirements for loading a manurespreader and traveling to and from the fieldvaried from 20 to 30 min per load. However,standardizing the data showed that 5 to 7 minwere required per 1,000 gal (9,000 lb). Thepreliminary results of the time motion dataindicate about 30 min per cow per year arerequired for handling manure from a concretestorage basin. These results were consistentamong the four dairies evaluated, eventhough differences existed in operating procedures.These results enable dairy producersto assess labor and equipment needs forperforming the various operations associatedwith hauling manure from a concrete storagebasin.
机译:每次装载时,装载撒肥机以及往返田间的时间要求从20分钟到30分钟不等。但是,标准化数据显示每1,000加仑(9,000磅)需要5至7分钟。需要时间运动数据的初步结果表明,每头母牛每年要处理约30分钟,才能处理混凝土存储盆地中的粪便。尽管在操作程序上存在差异,但这些结果与所评估的四个奶牛场一致。这些结果使乳制品生产商能够评估劳动力和设备需求,以执行与从混凝土贮藏池中拖拉粪肥相关的各种操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号