首页> 外文OA文献 >Implementation on solid waste reduction through 3R (NSWM policy) and elements to close gap between policy and contractors in construction industry in Penang
【2h】

Implementation on solid waste reduction through 3R (NSWM policy) and elements to close gap between policy and contractors in construction industry in Penang

机译:通过3R(NSWM政策)减少固体废物的实施以及缩小槟城建筑行业政策与承包商之间差距的要素

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The construction industry is seriously contributing to waste disposal due to the rapid development of construction industry. Weaknesses in the implementation on solid waste reduction through 3R among contractors in the construction industry will cause unsustainable construction waste management. This has increased construction waste in landfills, especially island areas where limited of land for waste disposal activities. This paper aimed to study the implementation on solid waste reduction through 3R NSWM Policy among contractors in the construction industry in Penang, Malaysia and elements to close gap between policy and contractors. This paper conducted by the semi-structured interview, questionnaire survey and participant observation. The respondents consisted of officers Municipal Council and CIDB in Penang and 61 contractors registered under CIDB located in Penang. The results show that solid waste reduction through 3R is currently ineffective and has limited implementation in the construction industry in Penang. Furthermore, most respondents revealed that law enforcement, implementation among contractors and awareness are the elements that appropriate to close gap between the policy and contractors. Construction waste should be managed through the 3R as it is sustainable. Thus, all parties involved should be aware and emphasize the 3R concept for reducing the construction waste disposal.
机译:由于建筑行业的快速发展,建筑行业为废物处理做出了重要贡献。建筑业承包商在通过3R实施减少固体废物方面的不足会导致不可持续的建筑废物管理。这增加了垃圾填埋场的建筑垃圾,尤其是岛上地区,那里的垃圾处理活动用地有限。本文旨在研究马来西亚槟城建筑业承包商通过3R NSWM政策减少固体废物的实施情况以及缩小政策与承包商之间差距的要素。本文通过半结构化访谈,问卷调查和参与者观察进行。受访者包括槟城市政局和CIDB的官员,以及在CIDB下在槟城注册的61名承包商。结果表明,通过3R减少固体废物目前效果不佳,在槟城的建筑行业中实施效果有限。此外,大多数答复者透露,执法,承包商之间的执行和意识是缩小政策与承包商之间差距的适当因素。建筑废弃物应具有可持续性,应通过3R进行管理。因此,所有相关方都应意识到并强调3R概念,以减少建筑垃圾的处置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号