首页> 外文OA文献 >Scheduling a flexible machining centre
【2h】

Scheduling a flexible machining centre

机译:安排柔性加工中心

摘要

This paper describes shopfloor scheduling techniques for a highly automated metal cutting machining centre. The machining centre is modelled as a generalized f1owshop. i.e. a set of workstations where each workstation may contain several parallel machines. Parts visit all workstations in the same order and are processed by at most one machine in each workstation (a part may skip a workstation). Constraints on the scheduling problem are imposed by release and due dates for each job. The objective is to minimize maximal lateness.The approach presented in this paper, is based on a decomposition of the generalized flowshop and uses a parallel machine scheduling algorithm as its key building block. The main contribution of this paper is on the latter subject: the development of schedules with the objective to minimize maximal lateness in a parallel machine system with release and due dates.
机译:本文介绍了高度自动化的金属切削加工中心的车间调度技术。加工中心被建模为广义的流水车间。即一组工作站,其中每个工作站可能包含多台并行计算机。零件以相同的顺序访问所有工作站,并且每个工作站中最多由一台机器处理(零件可以跳过工作站)。计划问题的约束条件是每个作业的发布日期和截止日期。目的是最大程度地减少最大延迟。本文提出的方法基于广义流水车间的分解,并使用并行机器调度算法作为其关键构建块。本文的主要贡献在于后一个主题:制定进度表,目的是最大程度地减少带有发布日期和到期日的并行机系统中的最大延迟。

著录项

  • 作者

    Zijm WHM Henk; Nelissen EHLB;

  • 作者单位
  • 年度 1990
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号