Sistema de control de proyecto de la construcción de la Estación Jipijapa y segmento de túnel del Metro de Quito mediante el análisis del valor ganado

机译:通过挣值分析,对基多地铁的吉皮贾帕站和隧道段进行施工的项目控制系统

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The correct and adequate management of a project as vast as the Metro de Quito is of extreme importance, due to the huge amounts of money and tight schedules that are worked with, and the necessity of counting on a public transportation system delivered on time by the city of Quito. This works prime objectives were to develop Dashboard, for the control of the project’s progress, based on the Earned Value Analysis and its graphs and indicators so that cost estimations when finishing the project could be made. This was achieved by building a database, based on monthly reports, and by taking the summary of all the information that was easy to analyze and understand through and Excel program that shows graphs and indicators based on filtered information. A dashboard was designed, based on the project’s progress for the construction of the subway station Jipijapa and the tunnel segment between stations El Labrador and Jipijapa, and sub-dashboards. The programming was done in MS Excel with through Macros. The control of the physical, economic and scheduled progress was made based on the initial chronogram, and the progress of the information provided in the monthly inspection reports delivered by Metro Alianza regarding the progress of each activity for each work package. The system allows to have the relevant information of cost, time and scope for monitoring the project, and to have relevant information for the proper management of the project.
机译:正确而充分的管理一个庞大的项目,例如基多大都会区,至关重要,这是因为要进行大量的资金和严格的时间表,而且有必要依靠公共交通系统按时交付基多市。这项工作的主要目的是基于挣值分析及其图形和指标来开发仪表板,以控制项目的进度,以便在完成项目时进行成本估算。这是通过建立基于月度报告的数据库,并汇总所有易于分析和理解的信息的摘要以及Excel程序(基于过滤后的信息显示图表和指标)来实现的。根据项目的进度,设计了一个仪表板,用于建设地铁站Jipijapa以及El Labrador和Jipijapa站之间的隧道段以及子仪表板。编程是通过MS Excel在Macros中完成的。物理,经济和计划进度的控制是基于初始计时码表,Metro Alianza提供的每月检查报告中提供的有关每个工作包每个活动进度的信息的进度。该系统允许具有成本,时间和范围的相关信息来监视项目,并具有用于正确管理项目的相关信息。