首页> 外文OA文献 >Penetration of Wind Turbine Generator into a 50 MW Capacity Diesel Power Electric Line System
【2h】

Penetration of Wind Turbine Generator into a 50 MW Capacity Diesel Power Electric Line System

机译:风力发电机渗透到50 MW容量的柴油电力电线系统中

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Development of a wind turbine generator (WTG) system in Japan seems to have lagged far behind compared with that in European countries and the United States. However, NEDO (New Energy and Industrial Technology Development Organization) has recently reported that Japan is also abundant in wind energy resources, based on a several-year systematic survey conducted throughout the country and that Japan could expect to obtain electricity to meet about 10-20% of national electricity demand from wind resources alone. One of the difficulties of WTG development is the fluctuation in speed and direction of natural wind, which causes fluctuations in both voltage and frequency in the electric utility system. Therefore, the problem that needs to be solved is how far WTG capacity may penetrate into that of the conventional existing electric power systems, for instance, diesel power systems on remote islands. This paper evaluates the actual performance of two 250 kW WTG pilot plants connected to a diesel power electric line system of about 50 MW located on the Miyako islands, Okinawa, Japan. Wind energy resources and wind characteristics on the islands are reported, and the fluctuation of the WTG output and its influence on the total systems are determined and also numerically analyzed. It is confirmed that the multiple WTGs have a tendency to cancel out each other's fluctuations at a rate inversely proportional to the square root of the number. From the results of the investigation and analysis, it is estimated that on the objective island WTG capacity of as much as 10 MW may be permissible, that is, 20% of the existing diesel system only if the WTG system consists of forty 250 kW machines or a much greater number of smaller-scale wind turbine generators.
机译:与欧洲国家和美国相比,日本的风力涡轮发电机(WTG)系统的开发似乎滞后了。但是,NEDO(新能源与工业技术开发组织)最近报告说,根据在全国范围内进行的为期数年的系统调查,日本在风能资源方面也很丰富,日本有望获得约10兆瓦的电力。仅风能就占全国电力需求的20%。 WTG发展的困难之一是自然风的速度和方向的波动,这会导致电力系统中电压和频率的波动。因此,需要解决的问题是,WTG容量可以渗透到现有的现有电力系统(例如,偏远岛屿的柴油发电系统)的容量中。本文评估了位于日本冲绳县宫古岛的两个250 kW WTG试点电厂的实际性能,该电厂与约50 MW的柴油电力线路系统相连。报告了岛上的风能资源和风的特征,确定了风力发电机组输出的波动及其对整个系统的影响,并进行了数值分析。证实了多个WTG具有以与该数字的平方根成反比的速率抵消彼此的波动的趋势。根据调查和分析的结果,估计在目标岛上,最大允许10兆瓦的WTG容量,即,如果WTG系统由40台250 kW的机器组成,则仅占现有柴油系统的20%或更多的小型风力发电机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号