首页> 外文OA文献 >Does Lost Time Cost You Money and Create High Risk?
【2h】

Does Lost Time Cost You Money and Create High Risk?

机译:浪费时间会浪费金钱并造成高风险吗?

摘要

The aim of the case study is to express the delayed repair time impact on the revenues and profit in numbers with the example of the outage of power plant units.udMain steps of risk assessment:ud•creating project plan suitable for risk assessmentud•identification of the risk factors for each project activitiesud•scenario-analysis based evaluation of risk factorsud•selection of the critical risk factors based on the results of quantitative risk analysis ud•formulating risk response actions for the critical risksud•running Monte-Carlo simulation [1] using the results of scenario-analysisud•building up a macro which creates the connection among the results of the risk assessment, the production plan and the business plan.ud
机译:案例研究的目的是通过电厂机组故障的实例来表达维修时间延迟对收入和利润的影响。 ud风险评估的主要步骤: ud•制定适合风险评估的项目计划 ud•确定每个项目活动的风险因素 ud•基于情景分析的风险因素评估 ud•根据定量风险分析的结果选择关键风险因素 ud•制定关键风险的风险应对措施 ud•使用方案分析的结果运行蒙特卡洛模拟[1] ud•建立一个宏,该宏在风险评估,生产计划和业务计划的结果之间建立联系。 ud

著录项

  • 作者

    Fekete István;

  • 作者单位
  • 年度 2012
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号