首页> 外文OA文献 >To investigate the fundamental causes of utility air voids content failures in asphalt layers to achieve Specification for the Reinstatement of Openings in Highways (SROH) compliant performance
【2h】

To investigate the fundamental causes of utility air voids content failures in asphalt layers to achieve Specification for the Reinstatement of Openings in Highways (SROH) compliant performance

机译:调查沥青层中实用空隙含量失败的根本原因,以达到恢复高速公路开口(SROH)兼容性能的规范

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The linkage between air voids content and durability in footways reinstatements with the limits currently in SROH is non-proven and unsupported by evidential research or trial data. Compounding of errors, particularly in density measurement of core samples and subsequent variability, generate biased air void content results that make the compliance largely a matter of chance. This led to a very wide range of predicted outcomes, putting both the contractor and the client at unacceptable risk. The use of a measured in situ air voids content criteria in a specification for footway reinstatements, where the entire operation is in restricted areas with hand laying process using recipe mixed materials, cannot be sustained on technical grounds with respect to relevant British Standard and Transport Research Laboratory (TRL) guide. Taking account of the service loads, nature and scale of works in footways, an in-service guarantee by the undertaker for an agreed extended period, linked to an allowable intervention level, could be a simple, realistic and acceptable solution, ensuring a durable reinstatement that removes the financial risk of failure from the highway authority.
机译:气孔含量和人行通道修复的耐久性之间的联系与目前在SROH中的限制之间的联系尚未得到证据研究或试验数据的证实和支持。误差的复合,尤其是在岩心样品的密度测量和随后的变异性中,会产生有偏差的气孔含量结果,这使得顺应性在很大程度上是一个偶然的问题。这导致了非常广泛的预测结果,使承包商和客户都处于无法接受的风险之中。在有关人行道修复的规范中,如果整个过程都在使用配方混合材料进行手工铺设的受限区域内进行,整个操作都在受限区域内进行,那么就无法根据相关英国标准和运输研究的技术理由来维持这种情况实验室(TRL)指南。考虑到人行道的工作量,工作性质和规模,承办方在约定的延长时间内提供在职保证,并与允许的干预水平挂钩,这可能是一种简单,现实和可接受的解决方案,可确保持久恢复工作从而消除了高速公路管理局的财务失败风险。

著录项

  • 作者

    Sadique, MM;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号