A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations

机译:具有随机活动持续时间的资源受限项目调度问题的纯主动调度程序

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The purpose of this research is to develop a new procedure for generating a proactive baseline schedule for the resource-constrained project scheduling problem. The main advantage of this new procedure is that it is completely independent of the reactive policy applied. This contrasts with the traditional methods that assume a predefined reactive policy. First, we define a new robustness measure, then we introduce a branch-and-cut method for solving a sample average approximation of our original problem. In a computational experiment, we show that our procedure outperforms two other published methods, assuming different robustness measures.
机译:这项研究的目的是开发一种新的过程,以针对资源受限的项目计划问题生成主动的基线计划。此新程序的主要优点是它完全独立于所应用的被动策略。这与采用预定义的被动策略的传统方法形成对比。首先,我们定义了一种新的鲁棒性度量,然后引入了一种分支切法来解决我们原始问题的样本平均近似值。在计算实验中,我们证明了在假设不同鲁棒性度量的情况下,我们的过程优于其他两种已发布的方法。