Critical chain project scheduling - Do not oversimplify

机译:关键链项目计划-不要过度简化

摘要

Critical chain scheduling/Buffer management (CCS/BM) – the direct application of the theory of constraints (TOC) to project management – has received much attention in project management literature. There still is controversy over the merits and pitfalls of the CCS/BM methodology. This paper focuses on the fundamental elements of CCS/BM logic and pinpoints some intricacies that are not commonly referred to in the available literature. The authors' analysis is based on a critical review of the relevant sources and experimentation with both commercial CCS/BM software and an internally developed CCS/BM-based tool.
机译:关键链调度/缓冲区管理(CCS / BM)–约束理论(TOC)在项目管理中的直接应用–在项目管理文献中受到了很多关注。关于CCS / BM方法的优缺点,仍然存在争议。本文着重于CCS / BM逻辑的基本要素,并指出了一些现有文献中通常未提及的复杂问题。作者的分析基于对相关资源的严格审查,并使用商业CCS / BM软件和内部开发的基于CCS / BM的工具进行了试验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号