首页> 外文OA文献 >Diablo Canyon Power Plant site ecological study Quarterly Report No. 2; October 1 - December 31, 1973
【2h】

Diablo Canyon Power Plant site ecological study Quarterly Report No. 2; October 1 - December 31, 1973

机译:暗黑破坏神峡谷发电厂现场生态研究第二季度报告; 1973年10月1日至12月31日

摘要

During the period October 1 - December 31, 1973, Fall surveys of permanent subtidal stations were completed with one station being surveyed. We were unable to locate 3 udsubtidal stations.udIntertidal studies were initiated in November. A total of 12udrandom stations was surveyed.udInterviews were conducted with commercial abalone fishermenudworking between Pt. Buchon to Pecho Rock. We continued toudmonitor the sea otter herd foraging between Pt. Buchon andudLion Rock.udProgress was achieved in the abalone temperature toleranceudstudies when a successful spawning occurred. (20pp.)
机译:在1973年10月1日至12月31日期间,完成了对永久性潮汐站的秋季调查,其中一个站已被调查。我们无法找到3个 udsubtidalstation。 ud潮汐研究于11月开始。总共对12个随机站进行了调查。 ud与Pt之间的商业鲍鱼渔民进行了访谈。 Buchon到Pecho Rock。我们继续监测铂族之间的海獭群觅食。当成功产卵时,鲍氏和 udLion Rock ud的鲍鱼温度耐受性得到了提高。 (20页)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号