首页> 外文OA文献 >Diablo Canyon power plant site ecological study Quarterly Report no. 22: October 1 - December 31, 1978
【2h】

Diablo Canyon power plant site ecological study Quarterly Report no. 22: October 1 - December 31, 1978

机译:暗黑破坏神峡谷电厂现场生态研究季度报告编号。 22日:1978年10月1日至12月31日

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Field work for this quarter consisted of completion of random 1/4-m2 subtidal stations from the summer sampling season. In addition, one permanent subtidal station was surveyed. No intertidal stations were surveyed. Sea otters, Enhydra lutris, remained scarce in the vicinity of the power plant.udLab work was comprised of processing subtidal algaeudsamples and sorting and identifying invertebrates fromudintertidal samples. Analysis of preoperational dataudfor final report proceeded apace. (7pp.)
机译:该季度的野外工作包括从夏季采样季节开始随机完成1/4平方米的潮下带测站。此外,还对一个永久性的潮汐站进行了调查。没有调查潮间带站。电厂附近的海獭Enhydra lutris仍然很稀缺。 udLab的工作包括处理潮下藻类 udsample以及从 udintertidal样品中分类和识别无脊椎动物。快速进行最终数据的操作前数据分析。 (7页)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号