As concrete dams age, the need for remedial grouting to reduce the seepage and uplift pressure in the rock foundations under them increases. Based on a case study of a Swedish dam with very low calculated safety against sliding, this paper discusses the application of the observational method (as defined in Eurocode 7) to manage safety aspects during remedial grouting. The studied case was complex in that grouting works posed the risk of causing increased uplift pressure, which could have induced sliding failure along a shallow, persistent, horizontal rock joint in the foundation. The approach applied in the studied case mainly followed the principles of the observational method, except in some highly significant safety aspects for which alternative procedures are suggested and discussed. Implementing these procedures along with the observational method offers a coherent framework to manage the safety aspects of the remedial grouting of concrete dam foundations that is in line with modern risk-informed dam safety policies.
机译:随着混凝土大坝的老化,为减少其下方岩石基础中的渗流和上升压力而进行的补救灌浆的需求也在增加。基于对瑞典滑坡的计算安全性非常低的案例研究,本文讨论了观测方法(如欧洲规范7所定义)在补救性灌浆期间管理安全方面的应用。所研究的案例很复杂,因为注浆工作可能会引起抬升压力增加,这可能会导致沿基础中的浅层,持久性,水平岩石节理滑动失败。在研究案例中采用的方法主要遵循观察方法的原理,但在一些高度重要的安全方面,建议并讨论了替代程序。将这些程序与观测方法一起实施,将提供一个连贯的框架来管理混凝土大坝基础的补救性灌浆的安全性,这符合现代风险大坝安全政策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号