首页> 外文OA文献 >Application of Groundwater modeling for designing a dewatering system: Case study of the Buvač Open Cast Mine, Bosnia and Herzegovina
【2h】

Application of Groundwater modeling for designing a dewatering system: Case study of the Buvač Open Cast Mine, Bosnia and Herzegovina

机译:地下水模型在设计脱水系统中的应用:以波斯尼亚和黑塞哥维那的Buvač露天煤矿为例

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper presents groundwatermanagement based on the results of groundwater modeling used to simulate theeffects of operation of three dewatering system scenarios of the Buvač open pitmine. Several aquifers exist within the Buvač limonite ore deposit region,which puts ore exploitation at risk. Groundwater modeling, was used tounderstand the groundwater regime within these aquifers. A previous numericalmodel (2007) was completed for the state of the groundwater regime prior to theopening of the open pit mine. During the last five years, the development ofthe open pit mine and associated activities have drastically modified the flowfield. The model was modified for the new conditions on the site, and with thenew data from the groundwater and surface water regime monitoring. The existingsystem of protection of the open pit mine from groundwater encompasses drainageof the alluvial aquifer and the ore body aquifer. This paper analyzes threescenarios of the open pit protection from groundwater for the period from 2013to 2024. The new model was used to simulate the effects of operation of thethree proposed dewatering systems. The differences in the effects of operationof the scenarios were quantified through the conditions of groundwater levelsand water budget. Recommendations have also been given for performingprediction calculations in the case of existence of drainage wells, with themost effective dewatering system determined from a hydrodynamic aspect. Theresults presented in this paper may be used for developing an effectivedewatering program.
机译:本文基于地下水模拟结果介绍了地下水管理,该模拟结果用于模拟Buvač露天矿的三种脱水系统方案的运行效果。布瓦奇褐铁矿矿床区内存在数个含水层,这使矿石开采面临风险。地下水模型被用来了解这些含水层中的地下水状况。在露天矿开采之前,已完成了针对地下水状况的先前数值模型(2007年)。在过去的五年中,露天矿的开发和相关活动极大地改变了流场。该模型针对现场的新条件进行了修改,并使用了来自地下水和地表水状况监测的新数据。露天矿井免受地下水的现有保护系统包括冲积含水层和矿体含水层的排水。本文分析了2013年至2024年这段时期的地下水裸露保护的三种情景。该新模型用于模拟三种拟议的脱水系统的运行效果。通过地下水水位和水预算的条件来量化情景运行效果的差异。还提出了在存在排水井的情况下进行预测计算的建议,其中最有效的脱水系统是从水动力方面确定的。本文介绍的结果可用于制定有效的脱水程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号