Modeling of a Pilot Wastewater Treatment Plant Operated With Variable Inflows

机译:具有可变流量的中试废水处理厂的模型

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The nitrification-denitrification process was studied on suspended activated sludge in a CSTR pilot plant of 15 litres. The system was operated in the single sludge mode and was fed with artificial wastewater. The experiments were carried out under steady and non-steady-state operational conditions in order to assess the reliability of mathematical simulations based on a modified ASM1 model that was successfully calibrated at the starting steady-state conditions. The dynamic model predictions and the measured responses of the real process yielded the initial values when the initial steady-state operational conditions were restored after stepped changes in the input flow. Although relatively good correlations were obtained between the experimental data and the model predictions, in some cases large differences were observed under non-steady-state operational conditions. This reflects the discrepancy between the complex nature of the real activated sludge processes and the model’s macroscopic descriptions of these processes.
机译:在15升的CSTR中试工厂中,对悬浮的活性污泥进行了硝化-反硝化过程的研究。该系统以单污泥模式运行,并注入了人工废水。为了在改进的ASM1模型基础上评估数学模拟的可靠性,该实验在稳态和非稳态操作条件下进行,该模型已在初始稳态条件下成功进行了校准。当输入流量逐步变化后恢复初始稳态操作条件时,动态模型预测和实际过程的测量响应会产生初始值。尽管在实验数据和模型预测之间获得了相对较好的相关性,但在某些情况下,在非稳态运行条件下观察到较大的差异。这反映了实际活性污泥过程的复杂性与模型对这些过程的宏观描述之间的差异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号