首页> 外文OA文献 >New Graphical Approach to Railway Infrastructure Capacity Analysis
【2h】

New Graphical Approach to Railway Infrastructure Capacity Analysis

机译:铁路基础设施容量分析的新图形方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

A variety of methodologies are being used across Europe for the estimation of railway infrastructure capacity. This paper introduces the basic principles of the methodologies used – analytical methodology (e.g. Slovak railways), UIC methodology, and the graphically developed methodology of the Department of Railway Transport, University of Žilina (KŽD). On the basis of these new approaches, the occupation time estimation is researched. This new method is based on a graphic approach that uses operational time intervals as part of occupation time in accordance with the Slovak methodology. The new methodology concerns graphic capacity estimation and is a conceptual framework developed by the authors for easier evaluation of occupation time in train traffic diagrams.
机译:欧洲各地正在使用多种方法来估算铁路基础设施的容量。本文介绍了所使用方法的基本原理-分析方法(例如斯洛伐克铁路),UIC方法以及Žilina大学(KD)铁路运输部门以图形方式开发的方法。在这些新方法的基础上,研究了占用时间估计。此新方法基于一种图形方法,根据斯洛伐克方法,该方法使用操作时间间隔作为占用时间的一部分。新方法涉及图形容量估计,是作者开发的概念框架,用于更轻松地评估火车交通图中的占用时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号