The Software Capability Maturity Model (SW-CMM) has become a popular model for enhancing software development processes with the goal of developing high-quality software within budget and schedule. The software cost estimation model, COnstructive COst MOdel (COCOMO), in its last update (COCOMO II) has a set of seventeen cost drivers and a set of five scale factors. Process Maturity (PMAT) is one of the five scale factors and its ratings are based on SW-CMM. This paper investigates the impact of process maturity on software development Schedule (cycle time) by deriving a new set of COCOMO II's PMAT rating values based on the most recent version of CMM, i.e. Capability Maturity Model Integration (CMMI). The precise data for the analysis were collected from the record of 40 historical projects which spanned the range of CMMI Levels, from Level 1 (Lower half and Upper half) to Level 4, where eight data points were collected from each level. The Ideal Scale Factor (ISF) method is applied in order to withhold the effect of the COCOMO II's PMAT scale factor. All prediction accuracies evaluations were measured using PRED (.20). The study shows that the proposed model (with the new PMAT rating values) produced better schedule estimates as compared to the generic COCOMO II model's schedule estimates.
机译:软件能力成熟度模型(SW-CMM)已成为一种流行的模型,用于增强软件开发流程,目标是在预算和进度范围内开发高质量的软件。在最后一次更新(COCOMO II)中,软件成本估算模型COnstructive COst MOdel(COCOMO)具有一组十七个成本动因和一组五个比例因子。流程成熟度(PMAT)是五个比例因子之一,其等级基于SW-CMM。本文通过基于最新版本的CMM(即能力成熟度模型集成(CMMI))得出一组新的COCOMO II的PMAT等级值,研究了过程成熟度对软件开发进度(周期)的影响。从40个历史项目的记录中收集了用于分析的精确数据,这些项目跨越了CMMI级别的范围,从级别1(下半部分和上半部分)到级别4,其中每个级别收集了八个数据点。为了抑制COCOMO II的PMAT比例因子的影响,应用了理想比例因子(ISF)方法。所有预测准确性评估均使用PRED(.20)进行了测量。研究表明,与通用COCOMO II模型的时间表估计相比,所提出的模型(具有新的PMAT等级值)产生了更好的时间表估计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号