首页> 外文OA文献 >Assessing the costs and benefits of native plant species for electric transmission line right-of-way revegetation within the Tennessee Valley Authority power service area
【2h】

Assessing the costs and benefits of native plant species for electric transmission line right-of-way revegetation within the Tennessee Valley Authority power service area

机译:评估田纳西河谷管理局电力服务区内输电线路通行植被的原生植物物种的成本和收益

摘要

The safe operation of electric transmission lines necessitates the suppression of tall, woody vegetation on associated rights-of-way (ROWs). Native warm season grasses (NWSG) are more expensive for ROW revegetation compared to typical exotic cool season grasses (ECSG), but they may alter the successional trajectory such that long-term maintenance costs are reduced. I conducted a cost-benefit analysis to determine if ROW revegetation with NWSG is cost effective compared to ECSG. I synthesized cost information obtained from the Tennessee Valley Authority regarding ROW planting and maintenance and data collected from a feasibility study of ROWs planted with NWSG. Revegetation with NWSG was found to be 6% more expensive than ECSG. The degree of woody suppression to make NWSG a worthwhile investment was found to be 12-21% using a break-even analysis. Despite the initial greater expense of NWSG, associated potential maintenance savings and indirect ecological, environmental, social, and economic benefits favor their use.
机译:电力传输线的安全运行需要抑制相关的通行权(ROW)上高大的木质植被。与典型的外来凉季草(ECSG)相比,本地暖季草(NWSG)的植被恢复植被昂贵,但它们可能会改变演替轨迹,从而降低长期维护成本。我进行了成本效益分析,以确定与ECSG相比,使用NWSG进行ROW再植被是否具有成本效益。我综合了从田纳西河谷管理局获得的有关ROW种植和维护的成本信息,以及从用NWSG种植ROW的可行性研究中收集的数据。 NWSG的植被再造成本比ECSG高6%。使用盈亏平衡分析,发现使NWSG值得投资的木质抑制程度为12-21%。尽管NWSG最初花费较大,但相关的潜在维护成本节省以及间接的生态,环境,社会和经济利益仍有利于其使用。

著录项

  • 作者

    Turk Joseph R.;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号