首页> 外文OA文献 >Performance comparison of a permissive overreach transfer trip (POTT) scheme over IEC 61850 and hard-wire
【2h】

Performance comparison of a permissive overreach transfer trip (POTT) scheme over IEC 61850 and hard-wire

机译:符合IEC 61850和硬线的允许的超限传输跳闸(POTT)方案的性能比较

摘要

The International Electrotechnical Commission (IEC) 61850 is a standard that allows communication integration of systems built from multivendor power protection relays. The standard describes the rules for integration of control, measurement, and protection functions within a power system network at the substation control levels. The standard was created with the idea of eliminating wiring in the substation and facilitating the communication between different relay vendors. This study implemented IEC 61850 standard in a Permissive Overreach Transfer Trip (POTT) scheme to protect a 166 mile, 230 kV transmission line using Generic Object Oriented Substation Events (GOOSE) messaging in the laboratory. Two multivendor digital line protection relays were placed at each end of the line to protect the transmission line via the POTT communication scheme. Faults were simulated at different points on the line using two modern relay test sets. A comparison of the POTT with IEC 61850 communication and a classic communication method, hard-wire, is made to determine the performance of the POTT with IEC 61850. It is observed that the maximum and minimum time delay between fault occurrence and the POTT operation with IEC 61850 communication is around 1.72 cycles (28.67 ms) and 1.50 cycles (25 ms), respectively, under laboratory conditions. The results on this research show that the POTT with IEC 61850 communication is faster or similar to the POTT with hard-wire communication.
机译:国际电工委员会(IEC)61850是允许对由多供应商电源保护继电器构建的系统进行通信集成的标准。该标准描述了变电站控制级别的电力系统网络中控制,测量和保护功能的集成规则。创建该标准的目的是消除变电站中的布线并促进不同继电器供应商之间的通信。这项研究在允许的超限转移行程(POTT)方案中实施了IEC 61850标准,以在实验室中使用通用的面向对象变电站事件(GOOSE)消息传递来保护166英里,230 kV输电线路。在线路的每一端都放置了两个多供应商数字线路保护继电器,以通过POTT通信方案保护传输线路。使用两个现代继电器测试仪对线路上不同点的故障进行了仿真。通过将POTT与IEC 61850通信和经典的通信方法(硬线)进行比较,可以确定POTT与IEC 61850的性能。可以观察到,故障发生与POTT操作之间的最大和最小时间延迟为在实验室条件下,IEC 61850通信分别约为1.72周期(28.67毫秒)和1.50周期(25毫秒)。这项研究的结果表明,采用IEC 61850通讯的POTT与采用硬线通讯的POTT更快或更相似。

著录项

  • 作者

    Ruiz José Luis;

  • 作者单位
  • 年度 2012
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号