首页> 外文OA文献 >General contractor?s project of projects ? a meta-project: understanding the new paradigm and its implications through the lens of entropy
【2h】

General contractor?s project of projects ? a meta-project: understanding the new paradigm and its implications through the lens of entropy

机译:总承包商的项目?一个元项目:通过熵的角度了解新范式及其含义

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Why do Koskela and others argue that the underlying theory of project management (PM)is obsolete? Project management works for the manufacturing industry, and for theconstruction industry at both the physical production level and the subcontractor level.Stakeholders, including the owner (along with due diligence, and O&M teams), architect(and the design team), general contractor (and its subcontractor team) create, transmit,process, manage and use information. The boundary between information (creation andtransmission) and physical production is where PM controls and predicts cost and scheduleand where quality controls fail to work as intended. This paper argues that subcontractorsgive project numbers for the physical part of the project, while general contractors?projectnumbers are actually aproject of projects(those of the subcontractors). The generalcontractor manages a meta-project (term and definition, as related to building construction,coined by Fernandez-Solis). The meta-project paradigm has significant consequences and isthe key to a novel understanding of the general contractor role. Lean construction?s percent(or promise) plan complete (PPC) gages the reliability of promises made, is a useful andviable indicator of the quality of the schedule, and serves as a surrogate measure of projectflow?how smoothly or chaotically a project runs. The PPC is operationalized as an indexthat meta-project stakeholders can use to calibrate the reliability of work in progress andprovide feedback on the predictability/variability of logistic plans. The methodology of thispaper uses conceptual analysis, the metonymic mapping of key concepts from thethermodynamics domain to the construction domain and showcases the concepts throughPPC case studies. Information entropy theories are discerned in the PPC reports. Inconclusion, scientific information theories, principles and characteristics offlow, in contrastto managerial principles, provide a clearer background for visualizing a novel understandingof the state of the projectflow at the meta-project level. It could be argued that this paper isabout defining a reference discipline and construed as?construction science viewed throughthe lens of entropy?but this is not the focus of this paper but the topic of the next.
机译:为什么Koskela和其他人认为项目管理(PM)的基本理论已过时?项目管理为制造业和建筑业在实物生产级别和分包商级别工作。利益相关者,包括所有者(以及尽职调查和O&M团队),建筑师(和设计团队),总承包商(及其分包商团队)创建,传输,处理,管理和使用信息。信息(创建和传输)与实际生产之间的边界是PM控制和预测成本与进度的地方,而质量控制无法按预期进行的地方。本文认为,分包商为项目的实体部分提供了项目编号,而总承包商?项目编号实际上是项目(分包商)的项目。总承包商管理一个元项目(术语和定义,与建筑物有关,由Fernandez-Solis负责)。元项目范式具有重大影响,并且是重新认识总承包商角色的关键。精益建设的百分比(或承诺)计划完成率(PPC)衡量了承诺的可靠性,是进度质量的有用且可行的指标,并且可以用作衡量项目流程(项目运行的顺利程度或混乱程度)的替代指标。 PPC已作为索引运行,元项目利益相关者可以使用该指标来校准进行中的工作的可靠性,并提供有关物流计划的可预测性/可变性的反馈。本文的方法论使用概念分析,从热力学领域到建筑领域的关键概念的代名词映射,并通过PPC案例研究展示了这些概念。信息熵理论在PPC报告中有所体现。与管理原则相比,科学的信息理论,流程的原理和特征最终为在元项目级别可视化对项目流程状态的新颖理解提供了更清晰的背景。可以说这篇论文是关于定义一门参考学科,并被解释为“从熵的角度看的建筑科学”,但这不是本文的重点,而是下一篇的主题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号