Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) ? Lining Main Canal ? Final

机译:基本建设项目的经济和保护评估:马弗里克县水利控制和改善区第一区(鹰口)?衬砌主运河?最后

摘要

Initial construction costs and net annual changes in operating and maintenance expensesare identified for a capital renovation project proposed by Maverick County Water Control andImprovement District No. 1 to the Bureau of Reclamation and North American DevelopmentBank. The proposed project involves lining 3 miles of the ?Main Canal? with a urethane liningand a concrete anchor and ballast system. Both nominal and real estimates of water and energysavings and expected economic and financial costs of those savings are identified throughout theanticipated 49-year useful life for the proposed project. Sensitivity results for both the cost ofwater savings and cost of energy savings are presented for several important parameters.Annual water and energy savings forthcoming from the total project are estimated, usingamortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211kwh) of energy per year. The calculated economic and financial cost of water savings isestimated to be $33.37 per ac-ft. The calculated economic and financial cost of energy savingsis estimated to be $0.0001322 per BTU ($0.451 per kwh).In addition, expected real (rather than nominal) values are indicated for the Bureau ofReclamation?s three principal evaluation measures specified in the United States Public Law106-576 legislation. The initial construction cost per ac-ft of water savings measure is $25.97per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savingsmeasure is $0.0001029 per BTU ($0.351 per kwh). The ratio of initial construction costs perdollar of total annual economic savings is estimated to be -13.65.
机译:初步建设成本以及运营和维护支出的年度净变化是针对Maverick县水利控制和改善区第一区向垦殖局和北美开发银行提出的一项资本改造项目确定的。拟议项目涉及衬砌3英里的“主运河”。带有聚氨酯衬里和混凝土锚固和压载系统。在拟议项目的整个预期49年使用寿命中,均会确定节水和节能的名义和实际估计以及这些节余的预期经济和财务成本。给出了几个重要参数的节水成本和能源节约成本的敏感性结果。使用摊销程序,整个项目的年度节水和节能量估计为每年用水4,084 ac-ft和2,041,095,338 BTU( 598,211千瓦时)。计算得出的节水的经济和财务成本为每英呎33.37美元。计算得出的节能成本的经济和财务成本估计为每BTU 0.0001322美元(每千瓦时0.451美元)。此外,美国垦殖局指出了美国公众指定的三项主要评估措施的预期实际(而非标称)价值。第106-576号法律。每ac-ft节水量的初始建筑成本为每ac-ft节水25.97美元。每BTU(kwh)的节能措施的初始建筑成本为$ 0.0001029 / BTU($ 0.351 / kwh)。初始建设成本每美元与每年总经济节省的比率估计为-13.65。

著录项

相似文献

  • 外文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号