首页> 外文OA文献 >Potential Operation and Maintenance (OM) Savings at Schools in the Ft. Worth Independent School District
【2h】

Potential Operation and Maintenance (OM) Savings at Schools in the Ft. Worth Independent School District

机译:英尺学校的潜在运营和维护(O&M)节省。值得独立学区

摘要

As part of the Texas LoanSTAR program, 44 schools in the Fort Worth IndependentSchool District (FWISD) had lighting retrofits performed on there in late 1991. TheEnergy Systems Laboratory of Texas A&M University is monitoring hourly energy use attwo of these 44 schools, Sims Elementary School and Dunbar Middle School. Dataanalyses at the Energy Systems Laboratory on the monitored data along with utility billingdata from 102 other schools in the FWISD, have shown major O&M savings potential inthese schools of over one-fourth of the total electricity consumption and gas consumption,which could amount to $ 1,658,000/yr. This report describes the analysis procedure andhighlights the O&M energy savings potential in each of the 104 schools.
机译:作为德克萨斯州LoanSTAR计划的一部分,沃斯堡独立学校区(FWISD)的44所学校在1991年底进行了照明改造。德克萨斯州农工大学的能源系统实验室正在监测这44所学校中的两所的每小时用电量,即Sims小学。和邓巴中学。能源系统实验室对监控数据以及FWISD其他102所学校的公用事业账单数据进行的数据分析显示,这些学校的主要O&M节省潜力超过总用电量和天然气消耗的四分之一,总计达1,658,000美元/年。本报告介绍了分析程序,并重点介绍了104所学校中每所学校的O&M节能潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号