首页> 外文OA文献 >Energy Consumption Simulation and Analysis of Heat Pump Air Conditioning System in Wuhan by the BIN Method
【2h】

Energy Consumption Simulation and Analysis of Heat Pump Air Conditioning System in Wuhan by the BIN Method

机译:BIN方法在武汉市热泵空调系统能耗模拟中的分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Based on the weather data of a standard year in Wuhan, derived from the data of the latest 15 years, the data for the BIN (temperature and humidity frequency) method of an annual and 8-hour system were calculated. Then the BIN method was adopted to simulate the annual energy consumption of groundwater heat pump systems (GWHPS) for an office building in Wuhan. Its annual energy consumption was obtained and compared with the partner of the air source heat pump systems (ASHPS). The results show that the energy consumption of the former was approximately less 23.3% than that of the latter in summer and 19.1% in winter.
机译:根据武汉市最近15年的标准年份天气数据,计算出一年八小时制的BIN(温度和湿度频率)方法数据。然后采用BIN方法对武汉某办公楼地下水热泵系统(GWHPS)的年能耗进行了模拟。获得了其年度能耗,并与空气源热泵系统(ASHPS)的合作伙伴进行了比较。结果表明,前者的能耗在夏季大约比后者少23.3%,在冬天大约为19.1%。

著录项

  • 作者

    Wen Y.; Zhao F.;

  • 作者单位
  • 年度 2006
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号