首页> 外文OA文献 >Commissioning : The Total Process
【2h】

Commissioning : The Total Process

机译:调试:全过程

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

In recent years, most new buildings have beenequipped with increasingly sophisticated heating,ventilating, and air-conditioning (HVAC) systems,energy conservation equipment, lighting systems,security systems, and environmental control devicesthat rely on electronic control. Very frequently thesesystems and design features have not performed asexpected. This can result in energy-efficiency losses.occupant complaints about comfort, indoor air qualityproblems. high operating costs, and increasedliability for building owners, operators, employers,and design professionals.Building commissioning was developed inresponse to these concerns. Commissioning involvesthe examining and testing of building systems to verifyaspects of the building design, ensure that thebuilding is constructed in accordance with thecontract documents, and verify that the building andits systems function according to the design intentdocuments. The process helps to integrate andorganize the design, construction, operations, andmaintenance of a building's systems to produce ahealthy, comfortable, and efficient facility.
机译:近年来,大多数新建筑都配备了越来越复杂的供暖,通风和空调(HVAC)系统,节能设备,照明系统,安全系统以及依赖电子控制的环境控制设备。这些系统和设计功能经常没有按预期执行。这可能会导致能源效率损失。乘员抱怨舒适度,室内空气质量问题。高运营成本,并增加了建筑物所有者,运营商,雇主和设计专业人员的责任。针对这些问题进行了建筑调试。调试涉及对建筑物系统的检查和测试,以验证建筑物设计的各个方面,确保按照合同文件进行建筑物的建造,并根据设计意图文件验证建筑物及其系统的功能。该过程有助于整合和组织建筑系统的设计,建造,运营和维护,以产生健康,舒适和高效的设施。

著录项

  • 作者

    Kettler G. J.;

  • 作者单位
  • 年度 1998
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号