首页> 外文OA文献 >A Case Study of the Use of BIM and Construction Operations Building Information Exchange (COBie) for Facility Management
【2h】

A Case Study of the Use of BIM and Construction Operations Building Information Exchange (COBie) for Facility Management

机译:使用BIM和建筑运营建筑物信息交换(COBie)进行设施管理的案例研究

摘要

This study investigates the use of Building Information Modeling (BIM) and COBie for Facility Management on three projects where these concepts were used. Factors which affect these concepts are identified through a literature review. The study is divided into the sections of Responsibility for database formulation, Characteristics of database, Technology and Effect on work order response times. A qualitative analysis is conducted to study the application of these concepts and identify any problems encountered. A case study is conducted on three projects where BIM and COBie were used for facility management. It is found that though the database generated by using these concepts is useful for preventive maintenance, the data gathering and formulation process needs to be started during the design and construction phase to make use of BIM for facility management functions like space allocation, 3D mapping, building automation etc. This study can be used as a reference for further research based on quantitative analysis of the factors studied in the case study.
机译:这项研究调查了在三个使用了建筑信息模型(BIM)和COBie的设施管理中使用这些概念的情况。通过文献综述确定了影响这些概念的因素。该研究分为数据库制定责任,数据库特征,技术和对工单响应时间的影响。进行了定性分析,以研究这些概念的应用并确定遇到的任何问题。在三个项目中进行了案例研究,其中BIM和COBie用于设施管理。已经发现,尽管使用这些概念生成的数据库对于预防性维护很有用,但仍需要在设计和构建阶段就开始数据收集和制定流程,以将BIM用于设施管理功能,例如空间分配,3D映射,楼宇自动化等。本研究可对案例研究中所研究的因素进行定量分析,为进一步研究提供参考。

著录项

  • 作者

    Jawadekar Salil;

  • 作者单位
  • 年度 2012
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号