首页> 外文OA文献 >Estimating production and cost for clamshell mechanical dredges
【2h】

Estimating production and cost for clamshell mechanical dredges

机译:估算翻盖式挖泥机的生产和成本

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

Clamshell dredges are used around the United States for both navigational and environmental dredging projects. Clamshell dredges are extremely mobile and can excavate sediment over a wide range of depths. The object of this thesis is to develop a methodology for production and cost estimation for clamshell dredge projects. There are current methods of predicting clamshell dredge production which rely on production curves and constant cycle times. This thesis calculates production estimation by predicting cycle time which is the time required to complete one dredge cycle. By varying the cycle time according to site characteristics production can be predicted. A second important component to predicting clamshell dredge production is bucket fill factor. This is the percent of the bucket that will fill with sediment depending on the type of soil being excavated. Using cycle time as the basis for production calculation a spreadsheet has been created to simplify the calculation of production and project cost. The production calculation also factors in soil type and region of the United States. The spreadsheet is capable of operating with basic site characteristics, or with details about the dredge, bucket size, and region. Once the production is calculated the project cost can be determined. First the project length is found by dividing the total amount of sediment that is to be excavated by the production rate. Once the project length is calculated the remainder of the project cost can be found. The methods discussed in this thesis were used to calculate project cost for 5 different projects. The results were then compared to estimates by the government and the actual cost of the project. The government estimates were an average of 39% higher than the actual project cost. The method discussed in this thesis was only 6% higher than the actual cost.
机译:翻盖式挖泥机在美国各地用于航行和环境挖泥项目。翻盖式挖泥船极易移动,可在广泛的深度范围内挖掘沉积物。本文的目的是为翻盖式挖泥机项目开发一种生产和成本估算的方法。目前有一些预测翻盖挖泥机生产的方法,这些方法依赖于生产曲线和恒定的循环时间。本文通过预测周期时间(即完成一个挖泥机周期所需的时间)来计算生产估算。通过根据现场特征改变循环时间,可以预测产量。预测翻盖式挖泥机产量的第二个重要组成部分是铲斗填充系数。这是根据被挖掘的土壤类型将充满沉积物的铲斗的百分比。使用周期时间作为生产计算的基础,创建了电子表格以简化生产和项目成本的计算。产量计算还考虑了美国的土壤类型和地区。该电子表格可以使用基本站点特征或有关挖泥机,铲斗尺寸和区域的详细信息进行操作。一旦计算出产量,就可以确定项目成本。首先,通过将要挖掘的沉积物总量除以生产率来确定项目长度。一旦计算出项目长度,就可以找到项目成本的其余部分。本文讨论的方法用于计算5个不同项目的项目成本。然后将结果与政府的估算和项目的实际成本进行比较。政府估计平均比实际项目成本高39%。本文讨论的方法仅比实际成本高6%。

著录项

  • 作者

    Adair Robert Fletcher;

  • 作者单位
  • 年度 2005
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号