Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - Relining Lateral A - Final

机译:基本建设项目的经济和保护评估:伊达尔戈县2号灌区(圣胡安)-改造A侧-最终

摘要

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San Juan) to the North American Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves relining ?Lateral A? with a geomembrane and shotcrete cover. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters.Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 2,542 ac-ft of water per year and 551,738,646 BTUs (161,705 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $74.49 per ac-ft. The calculated economic and financial cost of energy savings is estimated to be $0.0003698 per BTU ($1.262 per kwh).In addition, expected real (vs nominal) values are indicated for the Bureau of Reclamation?s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $57.76 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0002661 per BTU ($0.908 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -14.29.
机译:确定了伊达尔戈县2号灌溉区(又名圣胡安)向北美开发银行(NADBank)和开垦局提出的单项资本改造项目的初始建设成本以及运营和维护支出的年度净变化。 。拟议项目涉及重新确定“侧面A”带有土工膜和喷射混凝土覆盖层。在拟议项目的整个预期使用寿命内,确定了节水和节能的名义和实际估计以及这些节余的预期经济和财务成本。给出了几个重要参数的节水成本和节能成本的敏感性结果。使用摊销程序,整个项目的年度节水和节能量估计为每年2,542 ac-ft的水和551,738,646每年BTU(161,705千瓦时)的能源。计算得出的节水的经济和财务成本估计为每平方英尺74.49美元。计算得出的能源节约的经济和财务成本估计为每BTU 0.0003698美元(每千瓦时1.262美元)。此外,还为美国垦殖局指出了美国指定的三种主要评估措施的预期实际(相对于名义)值。公法106-576立法。每ac-ft节水量的初始建筑成本为$ 57.76 / acf。节能措施的每BTU(kwh)的初始建设成本为$ 0.0002661 / BTU($ 0.908 / kwh)。每美元初始建设成本与每年总经济节省的比率估计为-14.29。

著录项

相似文献

  • 外文文献
  • 中文文献

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号