Commissioning the Domestic Hot Water System on a Large University Campus: A Case Study

机译:大型大学校园的生活热水系统调试:案例研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Texas A&M University (TAMU) main campus in College Station consists of 110 buildings with12.5 million square feet of gross building space. Seventy-one of these buildings are connected to the maincampus domestic hot water (DHW) distribution system. The DHW loop is more than 50 years old and has hadcontinuing distribution problems. The main problems reported from several buildings were low hot watertemperature and long delays in obtaining hot water at fixtures. The objective of this study was to investigate thecauses of these problems and help determine how to best operate the system.It was found that reported problems of low flows, low temperatures and long hot water lag time resultedfrom reverse flows and no hot water circulation caused by: 1) Unadjusted return pumps with heads too high. 2) Pumps not installed or not running where needed. 3) Pumps with heads too low. 4) Check valves not installed where needed. 5) Insufficient piping capacity in two locations. This paper presents possible control strategies to alleviate these problems identified during the fieldinvestigation.
机译:德克萨斯大学农工大学(TAMU)位于大学城的主要校园由110栋建筑物组成,总建筑面积为1250万平方英尺。这些建筑中有71个已连接到主校园生活热水(DHW)分配系统。 DHW回路已有50多年的历史了,并且存在持续的分配问题。几座建筑物报告的主要问题是热水温度低和在固定装置上获取热水的时间长。这项研究的目的是调查这些问题的原因,并帮助确定如何最佳地运行系统。发现报告的流量低,温度低和热水滞后时间长的问题是由于回流造成的,并且没有热水循环造成的。 :1)扬程过高的未经调节的回流泵。 2)泵未安装或在需要的地方未运行。 3)扬程过低的泵。 4)检查未在需要的地方安装的阀门。 5)两个位置的管道容量不足。本文提出了可能的控制策略,以减轻现场调查中发现的这些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号