首页> 外文OA文献 >A Follow-up Study on the Persistence of Savings from the Retrocommissioning of Ten Buildings on a University Campus: Preliminary Results
【2h】

A Follow-up Study on the Persistence of Savings from the Retrocommissioning of Ten Buildings on a University Campus: Preliminary Results

机译:对大学校园内十栋建筑物进行改造后节省下来的持久性的后续研究:初步结果

摘要

A study has been initiated to provide follow-up analysis on the persistence of savings achieved from the retrocommissioning of ten buildings on a university campus. The buildings were originally commissioned in 1996, and the energy savings achieved over the next four years were tracked to evaluate their persistence levels. This study has now expanded the time frame after commissioning to an average of eight years by analyzing the energy consumption data for each building for the most recent year that valid data were available for the building. Preliminary results show high aggregate levels of savings persistence over the eight year average period for each building. The aggregate chilled water usage for the most recent data year for the ten buildings was virtually identical with the 1997 level, and only 56% of the baseline consumption. The aggregate hot water usage for the most recent data year for the ten buildings showed savings of 60.6% vs. savings of 66.4% for 1997, while the aggregate electricity savings were 22.9% vs. 11.5% for 1997. However, virtually all of the change in electricity use occurred in two buildings where it can not be regarded as a result of commissioning activities. The two buildings that required follow-up commissioning in 2001 (Kleberg and G.R. White) showed greater thermal savings after the follow-up than in 1997, suggesting that the 2001 effort was more thorough than that in 1997. If they are excluded from the analysis, the aggregate CHW savings of the other eight buildings decreased from 45.0% in 1997 to 36.3% in the most recent year while HW savings decreased from 54.4% to 40.5%. Even these savings show a high level of persistence over an average period of more than seven years. More analysis is needed to verify the quality of the data used in these comparisons, as well as to fill in some missing years where data are available. Follow up investigation is also needed to compare current building operating parameters with those in place just after commissioning and in the year 2000, to get a clearer picture of why changes in savings have occurred in each building.
机译:已开始进行一项研究,以便对大学校园中的十栋建筑物进行改造后节省的费用的持续性提供后续分析。这些建筑物最初于1996年投入使用,并跟踪了未来四年所实现的节能量,以评估其持久性水平。通过分析有效建筑可用数据的最近一年中每座建筑物的能耗数据,该研究现已将投产后的时间范围平均延长至八年。初步结果显示,每座建筑物在八年平均期间内的储蓄持久性总水平很高。十座建筑物的最新数据年度的冷冻水总用量与1997年的水平几乎相同,仅占基准用水量的56%。十座建筑物的最新数据年度的总热水使用量显示节省了60.6%,而1997年节省了66.4%,而总节电量则是22.9%与1997年的11.5%。用电的变化发生在两座建筑物中,不能将其视为调试活动的结果。需要在2001年进行后续调试的两座建筑物(Kleberg和GR White)在后续工作之后比1997年节省了更多的热量,这表明2001年的工作比1997年更加彻底。如果将它们排除在分析之外,其他八座建筑物的CHW节省总额从1997年的45.0%减少到最近一年的36.3%,而HW节省从54.4%减少到40.5%。即使是这些节省,在平均七年以上的时间里也显示出很高的持久性。需要进行更多分析,以验证这些比较中使用的数据的质量,并填写可获得数据的某些缺失年份。还需要进行后续调查,以将当前建筑物的运行参数与刚投产后以及2000年的现行建筑物运行参数进行比较,以更清楚地了解为什么每座建筑物的节余都会发生变化。

著录项

  • 作者

    Claridge D. E.; Toole C.;

  • 作者单位
  • 年度 2007
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号