首页> 外文OA文献 >Multi-area power system state estimation utilizing boundary measurements and phasor measurement units ( PMUs)
【2h】

Multi-area power system state estimation utilizing boundary measurements and phasor measurement units ( PMUs)

机译:利用边界测量和相量测量单元(PMU)进行多区域电力系统状态估计

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The objective of this thesis is to prove the validity of a multi-area state estimator and investigate the advantages it provides over a serial state estimator. This is done utilizing the IEEE 118 Bus Test System as a sample system. This thesis investigates the benefits that stem from utilizing a multi-area state estimator instead of a serial state estimator. These benefits are largely in the form of increased accuracy and decreased processing time. First, the theory behind power system state estimation is explained for a simple serial estimator. Then the thesis shows how conventional measurements and newer, more accurate PMU measurements work within the framework of weighted least squares estimation. Next, the multi-area state estimator is examined closely and the additional measurements provided by PMUs are used to increase accuracy and computational efficiency. Finally, the multi-area state estimator is tested for accuracy, its ability to detect bad data, and computation time.
机译:本文的目的是证明多区域状态估计器的有效性,并研究其比串行状态估计器具有的优势。这是利用IEEE 118总线测试系统作为示例系统来完成的。本文研究了利用多区域状态估计器而不是串行状态估计器带来的好处。这些好处主要体现在提高准确性和减少处理时间方面。首先,为简单的串行估计器解释了电力系统状态估计背后的理论。然后论文展示了传统的测量和更新,更准确的PMU测量如何在加权最小二乘估计的框架内工作。接下来,仔细检查多区域状态估计器,并使用PMU提供的附加测量值来提高准确性和计算效率。最后,测试了多区域状态估计器的准确性,检测不良数据的能力以及计算时间。

著录项

  • 作者

    Freeman Matthew A;

  • 作者单位
  • 年度 2006
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号