Late disputes and the NEC3 Engineering and Construction Contract

机译:后期纠纷和NEC3工程建设合同

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

One of the reasons for project owners’ choice of the NEC3 Engineering and Construction Contract (ECC) is the avoidance of the risk of claims and disputes long after project completion. In a number of cases the court has been presented with difficult questions concerning adjudication after project completion and delayed reference of adjudicated disputes to the applicable final tribunal. The cases have not been from projects procured with NEC contracts. This paper critically examines these questions, the court’s answers to them and their implications for the NEC3 ECC family of contracts. It concludes that, in the drafting of future editions of the contract, the promoters of the contract should consider provisions targeted at: ensuring that the test of awareness for the purposes of the Clause 61.3 time-bar is on an objective basis; conclusive evidence clauses that impose a disincentive against seriously delayed challenges to assessment of compensation events and payment; and providing that the decision of an adjudicator becomes finally binding if the dispute decided is not referred to the tribunal within a stated period.
机译:项目所有者选择NEC3工程和施工合同(ECC)的原因之一是,避免了在项目完成后很长时间内发生索赔和纠纷的风险。在许多案件中,法院在项目完成后面临有关裁决的棘手问题,并且已将审理的争端延迟提交给适用的终审法院。这些案例并非来自NEC合同采购的项目。本文认真地研究了这些问题,法院的回答以及它们对NEC3 ECC系列合同的影响。结论是,在合同的未来版本的起草中,合同的发起人应考虑针对以下方面的规定:确保在第61.3条中规定的时限进行客观的意识测试;决定性的证据条款,不利于严重延迟挑战赔偿事件和付款的评估;并规定,如果在规定的期限内未将争议解决给仲裁庭,则仲裁员的裁决将最终具有约束力。

著录项

  • 作者

    Ndekugri, Issaka E.;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号