首页> 外文OA文献 >The impact of socio-political and economic environments on private sector participation in energy infrastructure delivery in Ghana
【2h】

The impact of socio-political and economic environments on private sector participation in energy infrastructure delivery in Ghana

机译:社会政治和经济环境对私营部门参与加纳能源基础设施交付的影响

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

PurposeudInvestment in power and electricity generation for replacing aging infrastructure with new represents a major challenge for developing countries. This paper therefore aims to examine infrastructure projects’ characteristics and how socio-political and economic investment environments interplay to influence the degree of private sector participation (PPP) in infrastructure delivery in Ghana.ududDesign/methodology/approachudUsing World Bank Public-private infrastructure advisory facility (PPIAF) and private participation in infrastructure (PPI) project database data from 1994 to 2013, binary logistic regression was used to: determine the probability of a higher or lower degree of PPP; and examine the significance of factors that are determinants of private investments.ud udFindingsudThe findings reveal that the private sector is more likely to invest in a higher degree of PPP infrastructure projects through greenfield and concession vehicles as opposed to management and leasing contracts. From the extant literature, drivers of PPP included infrastructure project characteristics and the social–economic–political health of the host country. However, the significance, direction and magnitude of these drivers vary.ud udOriginality/valueudThis paper identifies investment drivers to PPP advisors and project managers and seeks to engender discussion among government policymakers responsible for promoting and managing PPP projects. Direction for future work seeks to explore competitive routes to infrastructure debt and equity finance options that finance energy projects.
机译:目的替代老化基础设施的权力和发电的UDIn投资代表了发展中国家的主要挑战。因此,本文旨在审查基础设施项目的特征以及社会 - 政治和经济投资环境如何影响加纳基础设施交付中的私营部门参与度(PPP)。 Ud Uddesign /方法/方法 Udusing世界银行公众 - 从1994年到2013年的基础设施咨询设施(PPIAF)和私人参与基础设施(PPI)项目数据库数据,二进制逻辑回归用于:确定PPP更高或更低程度的概率;研究私营投资决定因素的重要性的重要性。 ud udfindings udthe的调查结果表明,私营部门更有可能通过绿地和特许车辆投资更高程度的PPP基础设施项目,而不是管理和租赁合同。从现存的文献中,PPP的司机包括基础设施项目特征和东道国的社会经济政治健康。然而,这些司机的重要性,方向和幅度不同。 ud Udoriginality / Value Udthis纸张将投资司机识别到PPP顾问和项目经理的投资司机,并寻求在负责促进和管理PPP项目的政府政策制定者之间进行讨论。未来工作的方向旨在探索资助能源项目的基础设施债务和股权财务选择的竞争路由。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号