首页> 外文OA文献 >The features of three- and four-tier internal dumps capacity calculation with the additional capacity preparation in the dump tiers
【2h】

The features of three- and four-tier internal dumps capacity calculation with the additional capacity preparation in the dump tiers

机译:三层内部转储能力计算的特征,以及倾倒层中的额外容量准备

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The paper deals with the task of increasing the volume of rock placed in the internal dump. For that it is necessary first to analyze the existing technology of internal dumping, and then to determine the height of rock tiers being cut in the transport area. Analyzing the mining on the southern pits of Kuzbass it was found that now mostly three-tier dumps are piled. But for placing the extra volume of rock in the internal dump it will be required to pile dumps with more than three tiers.
机译:本文涉及增加内部转储中岩石数量的任务。为此,首先是首先分析现有的内部倾销技术,然后确定在运输区域切割的岩石层的高度。分析了Kuzbass南部坑的矿井,发现现在大多是三层倾倒堆积。但是为了将额外的岩石放在内部转储中,它将需要超过三层的倾倒。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号