首页> 外文OA文献 >Analysis of stabilisation method of gable walls of a barrack located at the section BI of the former KL Auschwitz II-Birkenau
【2h】

Analysis of stabilisation method of gable walls of a barrack located at the section BI of the former KL Auschwitz II-Birkenau

机译:位于前KL Auschwitz II-Birkenau部分Bi的营堡山墙稳定方法分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The subject of the article is an analysis of the stabilisation method of the western gable walls of a barrack with the inventory number B-123, situated at the section BI of the former German Nazi concentration and extermination camp Auschwitz II-Birkenau. The barracks of the former Birkenau have a documentary and historical value and are subject to protective conservation. A barrack with inv. no. B-123 had been erected in the last months of 1941 as a residential barrack, then it was used as a hospital facility. The barrack walls are characterised by low stiffness, because with the building’s plan of 36.17 m  11.39 m, the walls are only 0.12 m thick. Gable walls have been greatly deformed, as a result they have detached from longitudinal walls and their deflection is up to 120 mm. The construction of the walls is at risk, because a bad-quality wall is loaded with horizontal and vertical forces transmitted from the roof, on the eccentricity reaching 120 mm. Deformations are progressing as a consequence of such forces and the walls must be stabilised. In case of the western wall, it was decided to stop its further deformation and to increase the local carrying capacity by stabilising with steel elements connected with ties anchored in the ground. Given the historical value of the plasters with paint coats layers covering the wall, it was decided not to remove the wall deformation mechanically. For the eastern wall, which is not covered with plaster and was partly reconstructed after the war, the removal of its deflection by rectification was designed.
机译:的文章的主题是与库存数B-123一个营房西部山墙壁,位于前德国纳粹浓度和灭绝营奥斯威辛II-比克瑙的部分BI的稳定化方法的分析。前者比克瑙的军营有一部纪录片和历史价值并受到保护的保护。与INV兵营。不。 B-123曾在1941年的最后几个月被架设了作为住宅军营,然后将其作为医院设施。营房壁由低刚度,其特征在于,因为随着36.17米11.39米建筑物的计划,所述壁仅0.12米厚。山墙已大大变形,其结果是他们已经从纵向壁分离,并且它们的偏转是高达120毫米。壁的结构是在风险,因为一个坏质量壁装有从屋顶发送的水平和垂直力,上偏心到达120毫米。变形是进步为这种力量的结果,墙壁必须稳定。在西部壁的情况下,决定停止其进一步变形,并通过与在地面锚定关系连接钢元件稳定增加本地承载能力。鉴于膏药的与油漆涂层的层覆盖所述壁的历史值,就决定不以机械地移除壁变形。对于东墙,不覆盖用石膏和战争后重建的一部分,通过整改拆除其偏转的设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号