The impact of multilayer subcontracting system in construction industry in Pahang

机译:多层分包系统对彭亨州建筑业的影响

摘要

In construction industry, there is possibility for subcontractors to sublet their work to other subcontractors. It called multilayer subcontracting. Multilayer subcontracting has been identified as a source of poor time performance of projects in previous study. This study is about the impact of multilayer subcontracting system on project performance in Malaysian construction industry. The purpose of this paper is to study how multilayer subcontracting practice impacts the project time performance. It provides a perspective that multilayer subcontract could address the poor time performance caused by multilayer subcontracting. From previous study it shows that the multilayer subcontracting practice can be divided into five areas, which are communication, cost control, labour force, worker safety and productivity. This study expecting a positive relationship between multilayer subcontracting practices and project time performance. A method of survey questionnaire is being used in order to collect the data. The questionnaire distributed to contractor with “A” class registered with local authority, Pusat Khidmat Kontraktor (PKK). There are three sections in the questionnaire; Section A: Demography; Section B: Are they practice multilayer subcontracting; Section C; Their performance in time management. 84 respondents were targeted however only 52.38% gave feedback. The collected data was analysed using Statistical Package for the Social Science. This study found that there are only two areas that have positive relationship with the time performance namely worker safety and productivity. However it shows that the contractors actively practice multilayer subcontracting in the area of labour force.
机译:在建筑行业中,分包商有可能将其工作转租给其他分包商。它称为多层分包。在以前的研究中,多层转包被确定为项目时间表现不佳的根源。这项研究是关于多层分包系统对马来西亚建筑业项目绩效的影响。本文的目的是研究多层分包实践如何影响项目时间绩效。它提供了一个观点,即多层分包可以解决多层分包导致的时间性能差的问题。从先前的研究中可以看出,多层分包实践可以分为五个领域,即沟通,成本控制,劳动力,工人安全和生产率。这项研究期望多层分包实践与项目时间绩效之间存在正相关关系。为了收集数据,正在使用一种调查问卷的方法。该问卷已分发给在地方当局Pusat Khidmat Kontraktor(PKK)注册的“ A”级承包商。问卷分为三部分; A节:人口统计学; B部分:他们是否实行多层分包; C节;他们在时间管理方面的表现。以84位受访者为对象,但只有52.38%的人提供了反馈。使用“社会科学统计软件包”对收集的数据进行了分析。这项研究发现,只有两个与时间绩效有正相关的领域,即工人安全和生产率。但是,这表明承包商在劳动力领域积极实行多层分包。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号